Orange County NC Website
V ~,~1Jz~ <br />H. BUDGET WORIL SESSION-ORANGE CDUTyTY BOARD OF EAUCATION <br />Norman Haithcock, Chair of the Orange County Board of Education, noted <br />that the recommendation of $267,000 for capital projects for the Orange County <br />school system was not enough to fulfill the full needs of every student. <br />Dr. Dan Lunsford. Superintendent of Orange County Schools, presented an <br />outline of past accomplishments and gave general information and concerns about <br />the budget. He expressed a concern about the cash flow because of the low fund <br />balance. He emphasized that the budget request is fox a hold-the-line budget. <br />In capital outlay, many items have been listed in prior year requests and not <br />funded causing the list to be longer. He stated that $750.000 is needed each <br />year in recurring capital for capital outlay; $978,000 is requested for this <br />year. Of that amount $42,300 will be used to provide a facility for storing <br />diesel fuel fox use by both school systems. <br />Wayne Watts, Director of Finance far Orange County Schools, pointed out <br />the budget had been done in the standard foxmat as required by the state. <br />Orange County Schools is requesting a total of $4,966,992 from the County. The <br />total budget is slightly more than 15.5 million. The total operating expenses <br />of $3.983,569 represents a 21.9% increase. Watts highlighted the 12 minor <br />capital improvements. He noted that the instructional and media equipment <br />request includes replacement items. The sources of revenues are broken down <br />into state revenues and local revenues. The state revenues total $499,794 which <br />represents a 9.6~ increase over last years request. The pex child request of <br />$789 is an increase of $136 per child. He expressed concerns about the low <br />fund balance of $40,000 at the end of June, 1985, and the low contingency <br />amount of $31,000. Salary impxovement programs for non-certificated employees <br />would cost approximately $46,400. <br />Ar. Lunsford presented a memorandum which outlined the major capital <br />improvements for Drange High School and the time table. <br />Chair Willhoit asked about the potential impact of the Baeic Education <br />Plan, and Ar. Lunsford indicated the class size in 7-8 is averaged out at <br />29 and grade 9 a little less. If the projected class size reduction goes to 28 <br />and one at 26 thexe would not be any offset. <br />Commissioner Carey asked what impact the career gro[vth pxogxam would have <br />on the local budget and Dr. Lunsford indicated no increase in the budget in the <br />immediate future. <br />r <br />Planner Gene Bell noted the county Attorney informed him that this <br />item is not foz a waiver of the Land Use Plan Policy but instead a request for <br />an interpretation of which of two policies should apply to the sikuation. <br />Calvander Mobile Home Park located in Chapel Hi11 Township has requested a <br />pexmit for the installation of a package wastewater treatment plant to replace <br />the faii.ing mound septic system. <br />An interpretation is requested of the following two sections: <br />11.4 - Allow on-site disposal in low-density and rural areas <br />where soil conditions are acceptable. In rural areas kith <br />unacceptable soils, state-approved on-site sewage disposal <br />systems will be required. <br />11.6 - Allow ground absorption sewage disposal systems of 3000 <br />gallons per day or more design capacity and package sewage <br />treatment plants with a design capacity of 3000 gallons per day <br />