Orange County NC Website
The total budget is just under$1.4 million. The budget has been reduced by about <br /> $266,000. The biggest contribution is to the Chapel Hill Library of $249,000 (same as last year). <br /> The Cedar Grove branch will be closed beginning August 1 st, transferring materials, computers, <br /> and staff to the main library branch. The Cybrary in Carrboro will be eliminating one position and <br /> reducing operating hours from 44 to 20 per week. This will be done in coordination with the <br /> McDougle branch so that Monday-Friday there will be services in Carrboro at two different <br /> locations. Regarding the Carrboro branch, there is a reduction in non-permanent personnel, a <br /> reduction in the materials purchased, and reductions in administrative support. Regarding the <br /> main branch, there is a reduction of $166,000. There are reductions in non-permanent <br /> personnel, reductions in materials purchased, reduction in support for staff (travel, training, <br /> printing, and mileage), and reduction in maintenance and repairs. <br /> Commissioner Nelson said that there are charts in here with data about circulation but <br /> nothing about Cedar Grove. <br /> Library Services Director Lucinda Munger said that it is in the green handout and includes <br /> a history of usage since its inception. <br /> Frank Clifton said that one of the issues of the Cedar Grove library is one of security since <br /> two people are needed there at one time. <br /> Commissioner Nelson said that they worked very hard to get library services in the rural <br /> areas, but in closing this branch, it means that libraries will most likely not come back to the rural <br /> areas in the future. He said that there were conversations about co-locating libraries with the <br /> schools at one time. He suggested restarting these conversations. <br /> Lucinda Munger said that this was a very painful decision for her to close this branch. <br /> She plans to explore other ways to serve these areas. <br /> Commissioner Jacobs said that he thinks Pathways Elementary is designed similar to the <br /> way they use McDougle for a library. This is a little closer to the northern part of the County than <br /> the main branch library. It is designed so that people can get into the library when the school is <br /> closed. He said that there are stores in the rural areas that could be used as electronic libraries <br /> in order to keep a presence in these communities. <br /> Commissioner Jacobs made reference to the two Carrboro libraries and said that there <br /> are disproportionate cuts between these and the main library. Lucinda Munger said that the <br /> budgets are structured very differently. The main library had to take the largest hit because she <br /> zeroed in on operations. <br /> • Orange Public Transportation (OPT) -Section 27 <br /> Michael Talbert said OPT is in the process of being transferred over to Planning and <br /> Inspections. OPT services are more popular and the usage is up a little bit. About 60% of the <br /> budget still comes from state and federal money. The budget is being reduced by $81,653. All <br /> of this is in personnel services. An Administrative II position is being eliminated (April 2010). <br /> There is a recommendation of the elimination of a vacant OPT Driver position. There was an <br /> agreement to keep the retiring director's position vacant for the next six months. <br /> Frank Clifton said that there was discussion about contracting for transit services with <br /> Chapel Hill Transit or Triangle Transit. He said that the availability for the $10 tag fee is out there <br /> and this would generate about $1 million a year. <br /> Commissioner Gordon reminded the Board that when they were given the financial model <br /> for the county transit plan, it included the %2-cent sales tax and this $10 vehicle registration fee. It <br /> is important to have a transit plan before the Board enacts the fee. <br /> Commissioner Jacobs said that the Board has not agreed to the $10 tag fee. Frank <br /> Clifton said that it is the Board's option to enact the fee at any time. <br />