Browse
Search
ORD-2007-218 - Amendments to the Orange Co Stormwater Ord for Lands within the Neuse River Basin
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2007
>
ORD-2007-218 - Amendments to the Orange Co Stormwater Ord for Lands within the Neuse River Basin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 10:23:54 AM
Creation date
6/15/2010 9:05:01 AM
Metadata
Fields
Template:
BOCC
Date
10/23/2007
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
4n
Document Relationships
Agenda - 10-23-2007-4n
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 10-23-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix 3 <br />A. Engineer's Certification(s) <br />1. <br />2. Engineer's Certification of Stormwater Management <br />The engineering certification required on Stormwater Management Plans and construction plan <br />drawings shall be of the following form: <br />Engineer's Certification of Stormwater Management <br />I certify that this plan will meet the Nitrogen Export Reduction, and Peak Runoff Volume <br />requirements as set forth by the Orange County Stormwater Management Ordinance, and that the <br />permanent Nitrogen Reduction BMP's shown on this plan meet or exceed the guidelines in the <br />Orange County Design Manual. <br />P.E. SEAL: <br />SIGNATURE: <br />DATE: <br />3. Engineer's Certification of Completion <br />The engineering certification required upon completion of permanent Nitrogen Reduction BMP's <br />shall be of the following form: <br />Engineer's Certification of Completion <br />I certify that the permanent Nitrogen Reduction BMP for (name of plat) as recorded in the <br />PB , PG in the Office of the Orange County Register of Deeds has been completed <br />in conformance with the approved plans and specifications dated (approval date). <br />P.E. SEAL: <br />SIGNATURE: <br />DATE: <br />42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.