Browse
Search
ORD-2007-218 - Amendments to the Orange Co Stormwater Ord for Lands within the Neuse River Basin
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2007
>
ORD-2007-218 - Amendments to the Orange Co Stormwater Ord for Lands within the Neuse River Basin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 10:23:54 AM
Creation date
6/15/2010 9:05:01 AM
Metadata
Fields
Template:
BOCC
Date
10/23/2007
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
4n
Document Relationships
Agenda - 10-23-2007-4n
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 10-23-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Raleigh Rainfall Depths <br />a) 1 year, 24 hour depth: 3.00 inches <br />b) 1 year, 24 hour intensity: under development by DWQ staff <br />E. Exemptions to the Peak Flow Requirements <br />Peak flow requirements are waived for development that meets the following criteria: <br />1. Increase in peak flow between pre- and post- development conditions does not <br />exceed 10% (ten percent). <br />2. Proposed new development meets all of the following criteria: <br />a) total impervious surface is less than 15% (fifteen percent), and <br />b) remaining pervious surface maximizes stormwater runoff control and <br />conveyance. <br />3. Detention will cause further flooding on lands that have experience flooding <br />during previous storm events. This request for exemption must be prepared by a <br />North Carolina registered professional engineer and submitted in writing to the <br />Planning Director or Designee. Appeals of this decision will follow Section 7 -E <br />of this Ordinance. <br />Section 7 Stormwater Management Plan <br />A. Plan Requirements <br />1. Permanent on -site BMPs must be shown as part of the Stormwater <br />Management Plan and accompany the Land - Disturbing Plan submittal. BMPs are <br />to be in accordance with the NC and MD design manuals. <br />2. All calculations for Nitrogen Export, Peak Run -off Volume, and permanent <br />BMPs designed for Nitrogen Removal must be included in the submittal of the <br />Stormwater Development Plan. <br />B. Plan Approval <br />The Enforcement Officer is authorized to approve any Stormwater Management Plan <br />which is in conformance with the performance standards specified in the Orange County <br />Design Manual, and other requirements of this Ordinance. <br />C. Approved Plan a Prerequisite <br />The Enforcement Officer is not authorized to issue any permits for development on any <br />land within the Neuse River Basin that is defined as new development under Section 5 of <br />this Ordinance unless and until a Stormwater Development Plan in compliance with the <br />requirements of this Section has been approved. <br />D. Design of Permanent Nitrogen Export Reduction BMPs <br />When a permanent nitrogen export reduction BMP is required for new development to <br />meet the requirements of this Ordinance, a North Carolina registered professional <br />engineer shall prepare the plan with the Engineer's Certification of Stormwater <br />Management as shown in Appendix 3 affixed, signed, sealed and dated. <br />E. Fees <br />The Stormwater Management Plan Review Fee shall be paid at the time of submittal. The <br />fee shall be based upon the current Orange County Planning Fee Schedule. <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.