Browse
Search
ORD-2007-218 - Amendments to the Orange Co Stormwater Ord for Lands within the Neuse River Basin
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2007
>
ORD-2007-218 - Amendments to the Orange Co Stormwater Ord for Lands within the Neuse River Basin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 10:23:54 AM
Creation date
6/15/2010 9:05:01 AM
Metadata
Fields
Template:
BOCC
Date
10/23/2007
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
4n
Document Relationships
Agenda - 10-23-2007-4n
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 10-23-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br />Exempt <br />Allowable <br />Allowable <br />Prohibited <br />with <br />Mitigation <br />Temporary roads: <br />• Temporary roads that disturb less than or equal to 2,500 <br />X <br />square feet provided that vegetation is restored within six <br />months of initial disturbance <br />• Temporary roads that disturb greater than 2,500 square <br />X <br />feet provided that vegetation is restored within six months <br />of initial disturbance <br />• Temporary roads used for bridge construction or <br />X <br />replacement provided that restoration activities, such as <br />soil stabilization and revegetation, are conducted <br />immediately after construction <br />Temporary sediment and erosion control devices: <br />• In Zone 2 only provided that the vegetation in Zone 1 is <br />X <br />not compromised and that discharge is released as <br />diffuse flow in accordance with Section 3.0 <br />• In Zones 1 and 2 to control impacts associated with <br />X <br />uses approved by the Division or that have received a <br />variance provided that sediment and erosion control <br />for upland areas is addressed to the maximum extent <br />practical outside the buffer <br />• In- stream temporary erosion and sediment control <br />X <br />measures for work within a stream channel <br />Underground electric utility lines: <br />• Impacts other than perpendicular crossings in Zone 2 <br />X <br />only 3 <br />• Impacts other than perpendicular crossings in Zone 13,4 <br />X <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.