Browse
Search
ORD-2007-218 - Amendments to the Orange Co Stormwater Ord for Lands within the Neuse River Basin
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2007
>
ORD-2007-218 - Amendments to the Orange Co Stormwater Ord for Lands within the Neuse River Basin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 10:23:54 AM
Creation date
6/15/2010 9:05:01 AM
Metadata
Fields
Template:
BOCC
Date
10/23/2007
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
4n
Document Relationships
Agenda - 10-23-2007-4n
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 10-23-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exempt <br />Allowable <br />Allowable <br />Prohibited <br />with <br />Mitigation <br />Airport facilities: <br />• Airport facilities that impact equal to or less than 150 <br />X <br />linear feet or one -third of an acre of riparian buffer <br />• Airport facilities that impact <br />rp p greater than 150 linear feet <br />X <br />or one -third of an acre of riparian buffer <br />Archaeological activities <br />X <br />Bridges <br />X <br />Dam maintenance activities <br />X <br />Drainage ditches, roadside ditches and stormwater outfalls <br />through riparian buffers: <br />• Existing drainage ditches, roadside ditches, and <br />X <br />stormwater outfalls provided that they are managed to <br />minimize the sediment, nutrients and other pollution that <br />convey to waterbodies <br />• New drainage ditches, roadside ditches and stormwater <br />X <br />outfalls provided that a stormwater management facility is <br />installed to control nitrogen and attenuate flow before the <br />conveyance discharges through the riparian buffer <br />X <br />• New drainage ditches, roadside ditches and stormwater <br />outfalls that do not provide control for nitrogen before <br />discharging through the riparian buffer <br />X <br />• Excavation of the streambed in order to bring it to the <br />same elevation as the invert of a ditch <br />Drainage of a pond in a natural drainage way provided that <br />X <br />a new riparian buffer that meets the requirements of <br />Section 3.B and 3.0 is established adjacent to the new <br />channel <br />
The URL can be used to link to this page
Your browser does not support the video tag.