Browse
Search
ORD-2007-217 -Amendents to the Soil Erosion and Sedimentation Control Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2007
>
ORD-2007-217 -Amendents to the Soil Erosion and Sedimentation Control Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 10:25:19 AM
Creation date
6/14/2010 4:49:51 PM
Metadata
Fields
Template:
BOCC
Date
10/23/2007
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
4m
Document Relationships
Agenda - 10-23-2007-4m
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 10-23-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County SE & SC Ordinance October 23 2007 <br />Land Alterations - no grading, cutting or filling shall be commenced until erosion and <br />sedimentation control devices have been installed between the disturbed area and water <br />bodies, watercourses, wetlands, or adjoining properties. <br />Wetland Protection - wetlands and other water bodies shall not be used as sediment traps <br />during development. <br />Maintenance Requirements and Responsibility - erosion and sedimentation facilities <br />shall receive regular maintenance to ensure that they continue to function properly. <br />Temporary basins shall be cleaned out when they are filled to fifty (50) percent of their <br />design capacity. <br />Artificial Watercourses - any artificial watercourse (where the need is demonstrated) <br />shall be designed considering soil type so that the velocity of flow is low enough to <br />prevent accelerated erosion. <br />Buffer Area Requirements - soil and pollutants carried overland, primarily from roads, <br />trails, and/or land - disturbing activities, can be effectively trapped by leaving a relatively <br />undisturbed strip of vegetation parallel and adjacent to the watercourse. Properly managed <br />overland water flow can be directed into this buffer area in a manner that will reduce <br />velocity and cause dispersion of the water. Sediments carried by the water will settle out <br />as a result of this slowing and dispersion process. The width of these buffer areas shall <br />depend on the type of stream or drainage area. The width of the buffer strips shall be as <br />follows: <br />1. Creeks and tributaries - (i.e., permanent streams flowing directly into a <br />water supply reservoir within University Lake, Cane Creek, and Upper <br />Eno Watersheds and permanent streams flowing into such streams). <br />Measure along a line running perpendicular to the edge of the floodplain <br />(or if no floodplain has been demarcated, the center of the stream) fifty <br />feet from the edge of the floodplain (or if no flood plain has been <br />demarcated from the edge of the water) plus an additional distance equal <br />to: <br />4 x slope x 100 <br />where "slope" is expressed as a percentage derived by dividing by 100 the <br />rise in elevation between the floodplain boundary line (or if no floodplain <br />has been demarcated, the centerline of the watercourse) and a point one <br />hundred feet from that point along the above described perpendicular line. <br />2. Intermittent streams flowing into creeks and tributaries. Measure along a <br />line running perpendicular to the centerline of the intermittent stream fifty <br />feet from such stream centerline. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.