Orange County NC Website
Orange County Proposed Fee Schedule-FY 2010-11 <br /> Propos8tl Fee Chsuge for FY Last <br /> De artment/Pro ram Description Current Fee 241U=1.1�i�,`' Revision <br /> Solid Waste-E�te rise Fund <br /> Land dl nnd Rec�clix <br /> Waste Reduction,Reuse,and Rec clin Fee <br /> Basic Fee $37.00 2007 <br /> Urban Curbside added to Basic Fee �Z� $52.00+$37.00=$89.00 2009 <br /> Rural Curbside added to Basic Fee �'� $38.00+$37.00=$75.00 2009 <br /> Mulitfamil added to Basic Fee $19.00+$37.00=E56.00 2008 <br /> Mi�ced Waste $50.00/ton �52tU1}/ton '�.2009 <br /> ..,,.r .. , :.�_.:___ <br /> 522.00/Pick-u Truck/VanlCrailer Load 2009 <br /> $5.00/Car Load $1`iS.„b6/C*aT L'b�ii '�2000 <br /> ConsWCtion&Demo $44.00/[on � 2009 <br /> $22.00/Pick-u i'ruck/VaNTrailer Load 2009 <br /> $5.00/Caz Load 2009 <br /> Clean WoodNe etative Waste $I8.00/ton 2009 � <br /> $5.00/Pick-u Truck/VaNTrailer Load 2009 <br /> S[um s&Land Clearin Waste 544.00/ton 2009 <br /> Ve itativeWaste $I8.00/ton 2009 <br /> $I8.00/Pick-u Truck/VaWTrailer Load 2009 <br /> 53.00/Caz Load 2009 <br /> :n- : � _ � <br /> 12 Dis osalofMobiteHomes $I50.00/unit 3��1��O�p1�„�. �f„_,.��; ,'�2002 <br /> Conventional Yard Waste Mulch $22.00/3 cubic ard scoo 2009 <br /> Decorative Red Mulch&Con ost $28/one cubic ard scoo 2009 <br /> T'ves sroc iles tires/no state certification $I00.00/ton 1997 <br /> A liances hite Goods No char e <br /> Scra Metal No char e <br /> Cardboard � No chaz e <br /> Re lated Rec clable Materials Pemut 5%of assessed buildin emvt fee 2002 <br /> Re lated Rec clable Ma[erials License $25.00/vehicle Zpp2 <br /> Regulated Recyclable Materials Facility <br /> Certifica[ion $250.00/a lication 2002 <br /> Combined Load Rec clables $15.00/ton ZppZ <br /> $7.00/Pick-u TrucWVan/Trailer Load <br /> Re lated Material Pennit-Town of Cha el Hill 8%of A ]icable Buildin Pemut Fees 2008 <br /> Re lated Material Pemtit-Oran e Coun 5%of A licable Buildin Pemut Fees 2008 <br /> !i <br /> I <br /> (l)My fee changes will be included in this colwnn; Cl1 II <br /> a blank beside each fee means there is no fee change in FY 2010-I( Proposed Fee Schedule w <br /> I <br />