Orange County NC Website
Orange County Proposed Fee Schedule-FY 2010-11 <br /> � Proposed.Fee'-�hadg�f�i�"FY Last <br /> De artmenUPro ram Description Current Fee 2010-11��7 Revision <br /> Erosion Control fees Erosion Control Plan <br /> Intense urban 5507.00 er acre 2001 <br /> Urban $272.00 eracre 2001 <br /> Rural $I58.00 er acre ' 2001 <br /> Gradin Pernuts <br /> Intense Urban $1,241.00 er acre 2001 <br /> Urban $646.00 er acre 2001 <br /> Rural $310.00 er acre 2001 <br /> Private Roads S I55.00 1998 <br /> Stomtwater Mana emen[Plans $139.00 2001 <br /> Ins ection fees Buildin Schedule A <br /> New Residential 1&2 famil $0310 er s uare foot all hades included 2006 <br /> Buildin 0.126 . 2006 <br /> Electrical 0.058 2006 <br /> Plumbin 0.058 2006 <br /> Mechanical 0.068 2006 <br /> $OA lb($10.50 min per pmject),additional <br /> Plan Review 10.5%Town of Hillsborou 2006 <br /> Schedule B <br /> Residential Renovations and Accessory <br /> Structures I&2 famil $0.23 er s uaze foot 2006 <br /> Buildin $0.23 er s uare foot 2006 <br /> Elechical 552.50 er'ob 2006 <br /> Plumbin $52.50 er'ob 2006 <br /> Mechanical $52.50 er'ob 2006 <br /> $0.016($10.50 min per project),additional <br /> Plan Review 10.5%Town of Hillsborou 2006 <br /> Schedule C <br /> Mobile/Modulaz Hames <br /> Sin lewide <br /> Buildin $56.70 2006 <br /> Elechical $31.50 2006 <br /> Plumbin $23.I0 2006 <br /> Mechauical $23.10 2006 . <br /> W <br /> (I)My fee changes will be included in this colunm; ,�j <br /> a blank beside each fee means[here is no fee change in FY 2010-11 Proposed Fee Schedule <br />