Browse
Search
Agenda - 06-15-2010- 4cc
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 06-15-2010 - Regular Mtg.
>
Agenda - 06-15-2010- 4cc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 3:05:36 PM
Creation date
6/11/2010 4:22:47 PM
Metadata
Fields
Template:
BOCC
Date
6/15/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4cc
Document Relationships
Minutes 06-15-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Central Efland Sewer Extension Status <br />Summary Information for Residents <br />PROPERTY INFORMATION <br />Index Number <br />H01 <br />Property Owner Name <br />Baptist Home Missions, Inc. <br />PIN <br />9854087250 <br />TIVIBL <br />3.37.D.2 <br />EASEMENT INFORMATION <br />Approximate Easement Length (ft) <br />± 48 <br />Approximate Easement Width (ft) <br />+0-46 <br />Easement Area (sf) <br />1,101 <br />Total acreage (acres) <br />2.74 <br />HISTORICAL INFORMATION <br />Part of Original (^'1985) Agreement? <br />Yes <br />Name on Original (^'1985) Agreement <br />Efland Baptist Church <br />Number of Free Equivalent Residential Connections <br />(ERCs) in Historical Agreement' <br />1 <br />CURRENT INFORMATION <br />Property Developed /Undeveloped ?Z <br />Developed <br />Name on New Agreement <br />Baptist Home Missions, Inc. <br />Number of ERCs in current sewer design <br />1 <br />Number ERCs proposed, but not currently in design <br />n/a <br />CONNECTION INFORMATION <br />1) OC Availability Fee <br />($1,000 /acre+ $1,000 x 2.74) <br />$ 2,740.00 <br />2) Hillsborough Capital Facility Fee ($2,472 per tap) <br />$ 2772.00 <br />3) Orange County Tap Fee ($600 per tap) <br />$ 600.00 <br />Connection Incentives <br />?? <br />Total Connection Fees (1 +2 +3) <br />$ 0.00 <br />1 ERC = --300 gallons per day of usage <br />2 `Developed' refers a property with one or more buildings with a value greater than $1 as referenced by Orange <br />County Land Records Database ( http: / /www.co.orange.nc.us /gis/) <br />3 Assume 1 new connection per parcel if parcel does not currently have a tap in the sewer design. <br />4 Hillsborough Capital Facility Fee as of May 2010. <br />5 Connection Incentive provided per Orange County Connection Agreement (Proposal) <br />
The URL can be used to link to this page
Your browser does not support the video tag.