Browse
Search
Agenda - 06-15-2010- 4cc
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 06-15-2010 - Regular Mtg.
>
Agenda - 06-15-2010- 4cc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 3:05:36 PM
Creation date
6/11/2010 4:22:47 PM
Metadata
Fields
Template:
BOCC
Date
6/15/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4cc
Document Relationships
Minutes 06-15-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Orange County will construct a sewer collection and <br />treatment system [Hereinafter called the System] to <br />serve existing dwel�•ings and businesses within <br />Phase I of the Project•.Engineer's Preliminary <br />Report, 5th Edition dated April 5, 1984, last <br />revised August 7, 1984. [Hereinafter called Phase <br />I of the Project Area] <br />2. Orange County will appropriate $136,000 to the <br />Orange County Utility Enterprise Fund. The <br />principal plus interest at the interest rate charged <br />on delinquent ad valorem taxes shall be repaid <br />from that fund to the Orange County General Fund <br />by the assessment of tap fees of $600 per <br />residential equivalent connection. <br />3. Each person, firm or corporation connecting to the <br />system, <br />.other than those initially <br />connected <br />from <br />among <br />those intially applying for <br />connection, <br />shall <br />pay a $600 per residential equivalent tap fee to the <br />Enterprise Fund. <br />4. Those persons, firms or corporations initially <br />connecting, from those initially applying for <br />connection, shall be exempt from the $600 tap fee. <br />The Board shall establish by Resolution deadlines <br />for initial application and initial connection. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.