Browse
Search
NS Contract - Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Contract - Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 11:17:13 AM
Creation date
6/10/2010 11:50:45 AM
Metadata
Fields
Template:
BOCC
Date
8/21/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4n
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />p~ Rouald and vivian ~.n ~ Page 2 <br />Nan~er <br />~.ddress: ~D6 split Rail bane <br />City: ~~Ilsbaraugh, N,C, X7278 <br />Phone. 73~-73 3 <br />~ate~ ~ay~ ~, ZOa?' <br />' * sidin an the ri ~ side able, Install n~atcbing <br />~. Repav. the damaged v~ny~l g gli ~ <br />vi~.yl siding, <br /> <br />3. Caull~ all small holes in the vinyl siding and vinyl trim, Can~•actor <br />shall use l~D% white silicone caull~. All holes to be Bled properly and <br />smooth, <br />4, Re~.ove the decking boards anal handrails from the from po~•ch door . <br />and steps. Note: t~nly remove the hand-grip section of the band rails. <br />Install new pressure ~.•eated 2x~ material far the floor ~.~d steps. Install <br />2x~~ ressure treated for the hanth'ails. Contractor shall use gal~ran~~ed <br />p <br />screws for new woad installation. <br />5, Replace the center stringer an the franc porch steps. install press~u'e <br />~•eated lun~:ber. ~Praperly ~~ail springer to the porch band and level <br />with exis~.ng end stringers. ~ <br />~, Remove four ~4~ steps ~.•eads from the side~porch steps. Note: Refer <br />to Rehabilitation Specialist for boards to be removed. install matching <br />ressure t~•eated 2x~ lumber, Secure all hose boards and drive dawn all <br />p <br />,exposed Halls onside parch. <br />?, Prepare both front and side porches, steps anal railings for paint. Remove <br />all loose aint. P~•im.e with an oil based pruner and apply fro coats of <br />P <br />semi-gloss latex paint. Owner to choose color. . <br />~$ <br />8. Re ai~• ~.~e bral~en window can the right rear co~•ner. install matching <br />p <br />material. ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.