Browse
Search
NS Contract - Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Contract - Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 11:17:13 AM
Creation date
6/10/2010 11:50:45 AM
Metadata
Fields
Template:
BOCC
Date
8/21/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4n
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: rtanald apd vivian ding <br />Address: ~D~ Split fail Lane, <br />City': I3illsborough, ~.~, 27~7~ <br />phone: 73~~~313 <br />late: I~ay ~, ~D07 <br />RC~~F +~ ~ITT~R~ <br />1. ~emave the existing shingle ~•vof and felt paper to ~e sheathing, <br />Note. Aber existing roof Gave~~ng is removed; if fu~•tb.er da~.age is discovered <br />the Owner, Cantract4r and ~.ehabilitation Specialist will meet to review the wa~•l~, <br />dete~~nine a cQUrse ~af action and, if necessary, a cost for any additional worl~, <br />Install ~~ lb felt paper, new white eve staxte~•, vent boots, matching sk~r lights and <br />25 year shingles, defer to manufacturer specifcatians for shingle installation, <br />New felt pape~• shall be installed prope~•ly, Lace the valley and all felt paper to run <br />hori~antally. ~ . <br /> <br />2. ~.en~ave the existing gutters and dvwnspauts, Install seamless aluminum getters <br />a~~d downspouts. Nate: All gutters and downspouts shall be installed properly. <br />All downspouts shall attach to solid drain file and shall discharge rat less than <br />15 feet fionx the foundation wall. Nate, All drama file shall have positive drainage. <br />away h•am doe unit. Contractor shall install extend d~~ain file as necessary for <br />proper drainage, ~.efea` to ~.ehabilitation Specialist for drain file discharge <br />location. I~astall standa~•d gutters and over-sued downspouts. Contractor to <br />install proper httings for~over~si~ed downspouts into the drain file pipe, <br />S <br />3. Install aluminum gutters guards in all gutters. Nate Contractor to install <br />the getters guards px~operly, butters gu~.•ds to be installed under starter <br />shingle. <br />E~~T~R~CIR: <br />1, repair approximately 1 S' of damaged fascia on the center franc and rear boxing, <br />Install matching thicl~ness material- plywood or rnasanite etc. Install fascia using <br />galvanised pails. ~rinae new material with an o%1 based pruner, Cove~• all fascia <br />and gable trhn Frith white alu~ni~au~n call trim. Cover the gable saf~.t with solid <br />vinyl saflit, Install all necessa~•y T~channel and utility trim to properly ~.nish <br />boxing, Ilse prape~« nails far~cazl t~•ina, ~ white} <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.