Browse
Search
NS Contract - Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Contract - Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 11:17:13 AM
Creation date
6/10/2010 11:50:45 AM
Metadata
Fields
Template:
BOCC
Date
8/21/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4n
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Name; Ronald and ~i~ian Ong Page 8 <br />Address: ~QG Split Rail Dane <br />~~tyr ~I~1lsbaraUgh, Nr~. ~~~~8 <br />Pbane. 73~~731~ <br />Uate; lay ~, Z0~7 <br />P'~-CT~IN~, <br />~. install a new faucet an the hail bath~•aa~m sine. Install a premi.u~. grade <br />faucet. fake all plumbing connections, ~ . <br />~r Install a freeze proof water spigot on the rear Qf the ullitr Refer to <br />Rehabilitation Specialist 'or proper location, . l~~e all plumbing <br />connections, New water spigot to be secure an unit. <br />'~ <br />7. Se~•vice the septic tank, Contact a Zicensed se tic un~ in com an <br />p p p g p Y <br />to pump both septic tanks. Nate ,Uwner a~• Rehabilitation Specialist <br />must be an site during this warm. ~ ~ . <br />8. Install two ~2} Z~"' towel bats i.n the hall bath~•oa:mr Refer to owner <br />far proper location. New towel bars shall be secure in wall. ~ <br />~~N~RA~ R~PAI~S ~ . <br />1. Repai~~ tl~e dana.aged wall coyer between the kitchen and Laundr 1 <br />.. Y <br />l~uung area, Repair the shee~ack and fin~.sh smooth. Install new comer <br />~in~. Prime ~.~d paint co~~aer level with kitchen countertop, Prince and <br />paint new torn to match. <br />2r Repair the water stained ceilings atou~.d the existing sky-ights• ~ . <br />Re~no~e ail loose and damaged ceiling te~t~~re and sheetrockr Re-install <br />and spray texture, Note: Trxn~ maybe installed a~•ound opening to cQVe~• <br />all amts and damaged sections, Note; Refer to Rehabilitation Specialist fur <br />acceptable ~.•irn to be used, Prime and pau~t all ~~ew ~in~ around sky ligl~t~. ' <br />3. I~astall a ~-nailvapor barrier in the crawlspace. R.en~o~re all debris + <br />fiam g~•aund before ~rapar ba~•rier is installed, All poly to be clean . <br />and installed flat on ground, ~ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.