Browse
Search
Agenda - 06-08-2010 - 2a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 06-08-2010 - Budget Work Session
>
Agenda - 06-08-2010 - 2a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 1:53:54 PM
Creation date
6/7/2010 10:05:49 AM
Metadata
Fields
Template:
BOCC
Date
6/8/2010
Meeting Type
Budget Sessions
Document Type
Agenda
Agenda Item
2a
Document Relationships
Minutes 06-08-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County Capital Investment Plan <br />Descriptions of Projects <br />• submitted to the Town in early 2007(Town review and approval expected to take twelve months). <br />Construction of Phase I of the park would begin thereafter, with completion anticipated in late 2009. <br />• <br />Central Recreation Repairs Total County Project Budget $523,940 <br />2004 2/3 "s Bonds $523,940 <br />The Central Recreation facility, located at the Whitted Human Services Center in Hillsborough, <br />was constructed around 1950. The facility was a school for the Orange County School district. <br />Major renovations occurred during the early 1980's when the County originally obtained the <br />property. Since that time, the County has updated other systems within the building (such as <br />HVAC), however, there is an immediate need to repair public restrooms to address accessibility <br />issues, to add hot water service in restrooms and to insulate some offices located on the lower <br />level of the building. The projected cost of this work totals $235,000 and would be funded with <br />proceeds from the 2004 two- thirds net debt reduction bonds. In fiscal year 2005 -06, pay -as- <br />you-go funding would allow for replacement of the gymnasium window system. Estimated <br />project costs for the window system totals $150,000. All of the components of this project would <br />improve functionality of the facility for citizens as well as address energy conservation. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.