Orange County NC Website
- ~ ~ r7 ~ ~n <br />~. ~ ~ /~ <br />5 <br />10. B~LJ~R~L''~D~~F~PE~~_L•'DI~EIILi~T'~..1~E.I37F~_~1A_-BRISa&~4N_P~~Y~ <br />~!~~C ,pATORX P~VIIdG_PROGRARi <br />i~iotion was made by Car;u:~issioner 4]hitted, seconded by Commission- <br />. er Marshall to approve paving (1) Brigadoon Drive from Linden Road to <br />McDermott Drive, (2) t•icT~ermott Drive from Brigadoon Drive to Renfrew <br />Drive, and (3) Renfre~•r Drive from P•IcDermott Drive to the end of Renfrew <br />Drive under the Orange County Participatory Paving Program. VOTING: <br />_ UNANII~:OUSLY. <br />11. ZL)idlP~~~Ai)~IP~~~QN~`1~~~~_ (~~,i~ <br />(see page ~_ in the Ordinance nook) <br />Susan Smith, Planner presented this for consideration by the <br />Board. She noted that the only change recommended was the deletion of the <br />Last paragraph of the proposed te~:t amendment: <br />"Should the size ar configuration of the lot preclude compliance <br />with one or more of the setback requirements, compliance with setback <br />requirements which cannot be met cue to tat size or configuration shall <br />not be required." <br />tdotion was made by Commissioner Marshall, seconded by Commis- <br />sioner ti•+hitted to approve the revised text amendment to Article l1 <br />Nonconfformities as corrected with a notation at the bottom of section <br />11.11.10 to read "See 5oard of Adjustment section for appeal procedures". <br />VOTING: UNAP]IPIOUSL`i . <br />12. S~PpI•E~PBJ.~-~PP~~i~L~'~I~f~tsB~TA.I.N~_Bi?ADF~I <br />I•iotian was made by Conuaissionex ~•?alker, seconded by Commissioner <br />Gll:itted to approve the addition of Saddle Drive in T~Jillow Ridge Subdivi- <br />sion to the state maintained secondary road system. VOTING: UPIANIi~7OUSLX. <br />13. OU~DQ~_.I+1~Ii~Si~~~DBR~ GRDy~_gLt&PJ~FI~SxFL~~fYS?~T~ <br />Thompson presented the bid results for the outdoor lighting at <br />Cedar Grove Park and Orange High School: <br />y~PIDD$ ~9~~~~._E~P T!ENNrS COURTS ~~ <br />Tommy Lawrence 516,000 525,000 540,500 <br />Electrical Contr. <br />Holland Electrical Co.S19,864 528,833 548,000 <br />S & S Electrical 516,646 534,300 550,946 <br />Construction Co. <br />E & R, Inc. 520,320 530,256 550,576 <br />T•lotian was made by Commissioner tiaalker, seconded by Commmissioner <br />Lloyd to approve a contract to Tonuny Lawrence Electrical Contractors, Inc. <br />of Roxboro, N.C. for the purpose of constructing outdoor field lighting <br />far a softball field at Cedar Grove Park and for eight (S) tennis courts <br />- at Orange High School at a cost of 540,500 (516,500 for softball field, <br />and 525,000 for tennis courts. VOTING: Ayes, 2; Noes, 3 (willhoit, <br />(•garshall, and 4~Thitted) . <br />The Tennis Courts and the Softball Field at Orange High School <br />and their inclusion in the budget were discussed. <br />i+IOtion was made by Commissioner Whitted, seconded by Comrai~- <br />sioner Marshall to award a contract to Tommy Lawrence Electrical COn- <br />txactors, Inc. of Ro~:boxo, t~.C. for the purpose of constructing outdoor <br />field lighting for a softball field at Cedar Grove Park. VoTItdG: <br />U2:AIiIN:OUSLX. <br />