Orange County NC Website
i~'`~ <br />~!O <br />RESOLUTION <br />WHEREAS, deterioration of the Orange High School roof has advanced at an <br />accelerated rate due to adverse weather conditions through the <br />winter months, and <br />WHEREAS, failure to begin replacement could cause added damage to insulation <br />and subsurface, and <br />WHEREAS, the Orange County School System, has replaced the third wing and <br />hallway roofs at the High Schaol, it was not aware that the first <br />and second wings and auditorium would have tq be replaced during <br />the l9$3-$4 fiscal year, and <br />WHEREAS, by reprogramming the 1983-84 School Capital Budget monies can. be <br />used to begin but finish the project. However, without the assur- <br />an~e that the funds are appropriated or will be forthcoming the <br />School System is prevented under North Carolina General Statute <br />115C-432(a)(4) from awarding bids. <br />NOW, THEREFDRE BE IT RESOLVED, that the Board of Commissioners authorizes <br />the Drange County School Board to proceed with the letting of a <br />contract for replacing the Orange High School Roof and assures the <br />the Board of Education that funds will 6e appropriated for this <br />- project in the 1984-85 County budget exclusive of the appropriation <br />the School System would normally receive for basic capital needs. <br />Adopted this thirteenth day of March, 1984. <br />Don Wi oit, airman <br />Board of Commissioners <br />Attest: <br />every A. B yt e <br />Clerk to the Board of Commissioners <br />