Browse
Search
ORD-2007-081 - Carrboro High School (Formerly High School 3) CHCCS Capital Project Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2007
>
ORD-2007-081 - Carrboro High School (Formerly High School 3) CHCCS Capital Project Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 9:52:58 AM
Creation date
6/2/2010 11:53:24 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
6a
Document Relationships
Agenda - 06-26-2007-6a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 06-26-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. CHCCS High Performance Standards. Design standards shall comply with the <br />high performance building design criteria in School Board Policy 9040. <br />7. Public Road Improvement Standards. Endorse the timely cons u the of road <br />improvements to Smith Level Road and intersection improvements <br />intersection of Rock Haven Road and Smith Level Road which improvements have <br />been endorsed by Carrboro and Orange County and which improvements, if timely <br />constructed, will reduce by as much as $250,000 the offsite road improvement <br />cost to CHCCS in its construction of CHCCS high school #3. <br />8. Transportation Enhancement Standards. Reduce dependency on the <br />automobile for school functions and to reduce vehicle miles traveled related to <br />school functions by committing n t least $3of SecOtion 4Po:al from the amount <br />appropriated to the Construction <br />a. the purchase of buses or n an transportation systemeforse, in <br />tandem with the development of a <br />school uses and functions, including student, staff and teacher transportation <br />to and from school and student, staff, teacher and visitor transportation to and <br />from preschool and afterschool programs; <br />b. contributions of funds and expertise to the evaluation and development-of <br />the use of Chapel Hill Area Transit and /or Orange Public Transportation to <br />provide non - automobile alternatives for transportation of students, staff, <br />teachers and visitors to and from school, preschool and afterschool programs; <br />c. the purchase of transit software to be used to reduce vehicle miles <br />traveled in future redistricting decisions; <br />d. promote walking to and from school and pre and after school programs by <br />funding with matching grants the construction of sidewalks in Carrboro and <br />Chapel Hill located within 1.5 miles of CHCCS high school #3 (the school <br />"walk zone") which sidewalks are likely to be constructed by Carrboro and <br />Chapel Hill only in response to matching grants; <br />e. promote bike riding to and from school and pre and after school programs <br />by funding with matching grants the construction of bike lanes in Carrboro and <br />Chapel Hill within the attendance district of CHCCS high school #3 which bike <br />lanes are likely to be constructed by or at the request of Carrboro and Chapel <br />Hill only in response to matching grants; <br />f. promote bus and other transit transportation to and from school and pre <br />and after school programs by funding the construction of weatherproof <br />shelters (considering climate controlling them) at locations within the <br />attendance district of o sCe tabl is by Carrboroc Chapel and the conveniently close <br />to park and ride locate <br />University of North Carolina. <br />
The URL can be used to link to this page
Your browser does not support the video tag.