Browse
Search
Agenda - 06-01-2010 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 06-01-2010 - Regular Mtg.
>
Agenda - 06-01-2010 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 11:31:22 AM
Creation date
5/28/2010 1:00:18 PM
Metadata
Fields
Template:
BOCC
Date
6/1/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 06-01-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A 4 S 28 <br />From: <br />Date: Wed, 12 May 2010 18:34:10 -0400 <br />Subject: 1 C06 RR029912 -01- PI: Roper - Potential Site Issues <br />Dear Dr. Corvinus and Dr. Roper, <br />It has come to the attention of NCRR that the current site where the planned construction described in 1 <br />C06 RR029912 -01— PI: Roper is located has had a few wastewater issues. Please address the following <br />questions regarding the potential effect of the wastewater treatment issues on the execution of the <br />construction proposed in the awarded grant application. <br />1. How long will it take to fix the currently inoperable wastewater system or design a new wastewater <br />system? How will that impact the proposed timeline for the construction of the facilities funded by 1 <br />C06 RR029912 -01— PI: Roper? <br />2. What is the status of the permits for the wastewater treatment facilities? Has the Department of <br />Environmental and Natural Resources (DENR) revoked any permits or required new permits to be filed <br />for the current wastewater facilities? Will these permits delay the construction proposed in this grant? <br />3. Have the issues /citations from DEN been resolved? If so, what was the resolution? If not, when <br />does the University of North Carolina Chapel Hill anticipate resolution of these issues? <br />4. What is the distribution of waste between the two current wastewater systems? Is one solely for <br />animal water and the other solely for "domestic" waste, or is there co- mingling of waste in either <br />wastewater treatment facility? <br />5. Has the University of North Carolina Chapel Hill evaluated the facilities for any other <br />wastewater /water treatment issues? If so, please indicate the findings. <br />6. Do any wetlands exist on the construction site proposed in 1 C06 RR029912 -01— PI: Roper? If so, <br />please indicate how this will affect the construction and construction timeline for the proposed <br />buildings for this grant. <br />7. Have there been any changes in the plans for construction in order to make the buildings /facilities <br />more environmentally sustainable? If so, please describe them. How would these plans affect the <br />timing of the construction approved in 1 C06 RR029912 -01— PI: Roper? <br />8. How will the University of North Carolina Chapel Hill ensure that similar issues do not occur at this <br />site due to construction and /or the additional animals to be housed once construction is complete? <br />Please provide a response that is countersigned by an authorized business official at the University of <br />North Carolina Chapel Hill no later than close of business on May 21, 2010. <br />Please let me know if you have any questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.