Browse
Search
Agenda - 06-01-2010 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 06-01-2010 - Regular Mtg.
>
Agenda - 06-01-2010 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 8:58:35 AM
Creation date
5/28/2010 12:55:27 PM
Metadata
Fields
Template:
BOCC
Date
6/1/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 06-01-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A -3 <br />• Local government proposes compliance timeframe, plan shall meet <br />explicit criteria; or <br />• At least half of reductions by 2036 ( +15 yrs) before implementing a Stage <br />3 load reduction program <br />Stage 3 <br />o Local government proposes compliance timeframe to achieve the remainder of <br />reductions up to the 40% TN and 77% TP goal, plan shall meet explicit criteria <br />Point Sources <br />Each nutrient - producing point source achieves reductions in load <br />• Waste load allocations for large facilities ( >O.1 MGD) <br />• Small facilities ( <O.1 MGD) implement O &M measures to get reductions <br />Stage 1 <br />• Mass allocations for large facilities in upper watershed based on 20% TN / 40% <br />TP reductions using equivalent concentrations at current flow + 10% <br />• Implement Biological Nutrient Removal (BNR) technologies at large package <br />plants in lower watershed. <br />• Achieve by 2016 (5 years) <br />• Stage 2 <br />• Mass allocations for large facilities in upper watershed based on 40% TN / 77% <br />TP reductions using equivalent concentrations at full permitted flow <br />• Achieve by 2031 ( +15 years) <br />Agriculture <br />• Stage 1 <br />• Achieve collective N & P reduction goals of 20% TN and 40% TP <br />• Residuals application uses RYE N rates and run, comply with PLAT <br />• Achieve by 2021 (10 years) <br />• Stage 2 (if Stage 1 goals achieved) <br />• Achieve collective N & P reduction goals of 40% TN, 77% TP <br />• Achieve by 2036 ( +15 years) <br />• Stage 2 (if Stage 1 goals not achieved) <br />• Buffer all cropland and buffers and exclusion on all pasture, and <br />• Achieve collective N & P reduction goals of 40% TN, 77% TP <br />• Achieve by 2036 ( +15 years) <br />State and Federal Entities <br />• Similar approach as used in Jordan requirements <br />Nutrient Trading <br />• Similar approach as used in Jordan to provide overarching open trading across all sources <br />Buffer <br />• No new rules - Existing Neuse Buffer Rules continue to apply <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.