Browse
Search
Agenda - 06-01-2010 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 06-01-2010 - Regular Mtg.
>
Agenda - 06-01-2010 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 10:19:00 AM
Creation date
5/28/2010 12:52:44 PM
Metadata
Fields
Template:
BOCC
Date
6/1/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 06-01-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
ORD-2010-048 Upper Eno Watershed Critical Area - Zoning Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2010
RES-2010-047a Resolution Amending the 2030 Comprehensive Plan amending boundaries of the watershed critical area overlay districts
(Message)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upper Eno "Protected" <br />Upper Eno "Critical Area" <br />buffer width shall be calculated using <br />whichever is greatest. <br />Method A, but shall not be less than 100'. <br />Water <br />No new treatment system will be <br />New septic tanks, pump tanks and their <br />Supply /Sewage <br />permitted where effluent disposal occurs <br />appurtenances shall be located outside of any <br />Disposal <br />on a separate lot from the source of <br />stream buffers and at least 100 feet from a <br />wastewater generation; provided, <br />perennial or intermittent stream as shown on <br />however, off -site systems shall be <br />the USGS Quadrangle maps, and at least 150 <br />permitted when located in a Flexible <br />feet from a reservoir. <br />Development subdivision approved in <br />New nitrification fields shall be located outside <br />accordance with Section IV -B -10 of the <br />of any stream buffers and at least 100 feet <br />Orange County Subdivision Regulations. <br />from a perennial or intermittent stream as <br />• New septic tanks and their nitrification <br />shown on the USGS Quadrangle maps, and <br />fields shall be located outside of any <br />at least 300 feet from a reservoir. <br />stream buffers and at least 100 feet from <br />Water supply and sewage treatment systems <br />a perennial or intermittent stream as <br />shall be limited to individual wells and septic <br />shown on the USGS Quadrangle maps. <br />systems or individual on -site alternative <br />disposal systems; provided, however, off -site <br />systems shall be permitted when located in a <br />Flexible Development subdivision approved in <br />accordance with Section IV -B -10 of the <br />Orange County Subdivision Regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.