Browse
Search
Agenda - 06-01-2010 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 06-01-2010 - Regular Mtg.
>
Agenda - 06-01-2010 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 10:19:00 AM
Creation date
5/28/2010 12:52:44 PM
Metadata
Fields
Template:
BOCC
Date
6/1/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 06-01-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
ORD-2010-048 Upper Eno Watershed Critical Area - Zoning Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2010
RES-2010-047a Resolution Amending the 2030 Comprehensive Plan amending boundaries of the watershed critical area overlay districts
(Message)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> U-ENO-PW 70% <br /> BACK-PW ISR in Commercial and/or Industrial Nodes as designated in the <br /> Land Use Element of the Comprehensive Plan (high-density <br /> option) with structural BMPs if ISR > 12%; <br /> AND <br /> 50% ISR for all fire stations and solid waste collection centers <br /> outside of Commercial and/or Industrial Nodes as designated in the <br /> Land Use Element of the Comprehensive Plan, with structural <br /> BMPs if ISR > 12%; <br /> AND <br /> 12% ISR for all other non-residential uses outside of Commercial <br /> and/or Industrial Nodes as designated in the Land Use Element of <br /> the Comprehensive Plan (* BMPs cannot be used to satisfy <br /> watershed impervious surface requirements); <br /> AND <br /> on-site infiltration of the first inch of stormwater runoff; <br /> AND <br /> A limit of 1,151 acres of non-residential use throughout U-ENO-PW <br /> (5.0%) and 163 acres throughout BACK-PW (1%). <br /> HYCO-PW 50% ISR for all fire stations and solid waste collection centers; <br /> FLAT-PW AND <br /> 12% ISR for all other non-residential uses; <br /> AND <br /> on-site infiltration of the first inch of stormwater runoff; <br /> AND <br /> a limit of 1% of the watershed for non-residential use (37 acres in <br /> HYCO-PW, 66 acres in FLAT-PW). <br /> * BMPs cannot be used to satisfy watershed impervious surface <br /> requirements. <br /> L-ENO-PW 70% impervious surface, with structural BMPs required when <br /> impervious surface exceeds: <br /> 24% (w/ curb and gutter); or <br /> 36% (w/o curb and gutter). <br /> HAW-PW 24% impervious surface limit. <br /> JORDAN-PW * BMPs cannot be used to satisfy watershed impervious surface <br /> requirements. <br /> BMP's as mandated by the Stormwater Management Program for Lands within the Neuse River Basin are allowed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.