Browse
Search
Agenda - 06-01-2010 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 06-01-2010 - Regular Mtg.
>
Agenda - 06-01-2010 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 10:19:00 AM
Creation date
5/28/2010 12:52:44 PM
Metadata
Fields
Template:
BOCC
Date
6/1/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 06-01-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
ORD-2010-048 Upper Eno Watershed Critical Area - Zoning Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2010
RES-2010-047a Resolution Amending the 2030 Comprehensive Plan amending boundaries of the watershed critical area overlay districts
(Message)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 16 <br /> 2. Non-Residential Development <br /> Amended 1/4/94; 10/19/99;8/21/01 <br /> DISTRICT IMPERVIOUS SURFACE/DETENTION POND REQUIREMENTS <br /> (NON-RESIDENTIAL) <br /> UNIV-CA Same as Residential (See previous Table) <br /> UNIV-PW <br /> CANE-CA 5-acre minimum lot size, with potential of up to five lots as small as <br /> two acres for lots of record October 19, 1999 (Amended 10-19-99); <br /> AND <br /> 6% impervious surface limit. <br /> * BMPs cannot be used to satisfy watershed impervious surface <br /> requirements. <br /> U-ENO-CA 2-acre minimum lot size <br /> AND <br /> 6% impervious surface limit. <br /> * BMPs cannot be used to satisfy watershed impervious surface <br /> requirements. <br /> CANE-PW 5-acre minimum lot size with potential of up to five lots as small as <br /> two acres for lots of record October 19, 1999 (Amended 10-19-99); <br /> AND <br /> 50% ISR for all fire stations and solid waste collection centers; <br /> AND <br /> 12% ISR for all other non-residential uses; <br /> AND <br /> on-site infiltration of the first inch of stormwater runoff; <br /> AND <br /> a limit of 1.0% of the watershed for non-residential use (139 acres <br /> in CANE-PW). <br /> * BMPs cannot be used to satisfy watershed impervious surface <br /> requirements. <br /> LITTLE-PW 2-acre minimum lot size <br /> AND <br /> 50% ISR for all fire stations and solid waste collection centers; <br /> AND <br /> 12% ISR for all other non-residential uses; <br /> AND <br /> on-site infiltration of the first inch of stormwater runoff; <br /> AND <br /> a limit of 1.0% of the watershed for non-residential use (139 acres <br /> in CANE-PW). <br /> * BMPs cannot be used to satisfy watershed impervious surface <br /> IL requirements. <br /> *BMP's as mandated by the Stormwater Management Program for Lands within the Neuse River Basin are allowed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.