Browse
Search
Agenda - 06-01-2010 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 06-01-2010 - Regular Mtg.
>
Agenda - 06-01-2010 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 10:19:00 AM
Creation date
5/28/2010 12:52:44 PM
Metadata
Fields
Template:
BOCC
Date
6/1/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 06-01-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
ORD-2010-048 Upper Eno Watershed Critical Area - Zoning Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2010
RES-2010-047a Resolution Amending the 2030 Comprehensive Plan amending boundaries of the watershed critical area overlay districts
(Message)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> 10 Proposed Amendments to Article 22 of the Zoning Ordinance (additions are <br /> underlined, deletions are in strike-through text) <br /> ARTICLE 22 <br /> DEFINITIONS <br /> Critical Area, County Designated - The land area within one-half mile of the <br /> normal pool elevation (or designated elevation) of an existing Class II water supply <br /> reservoir, or the ridgeline of the watershed, whichever is less; and the land area <br /> within one-half mile of the normal pool elevation (or designated elevation) of a <br /> proposed water supply reservoir designated for protection or the ridgeline of the <br /> watershed whichever is less; and the area within one-half mile of streams flowing <br /> into Class I reservoirs as designated for protection within the Zoning_Ordinance. <br /> Amended <br /> 1/4/94 <br /> Critical Area, State Required - The land area within one-half mile of the normal <br /> pool elevation of water supply in <br /> which an intake is located (i.e., Class I reservoirs), or the ridgeline of the <br /> watershed, whichever is less. <br /> i <br /> Reservoir, Class I - A body of water, such as a pond or lake, confined by a dam <br /> or other barrier to be used for public water supply from which water flows by <br /> gravity or is pumped directly to a treatment plant or to a small intervening storage <br /> basin and thence to a treatment plant. <br /> Reservoir, Class II - A body of water, such as a pond or lake, confined by a dam <br /> or other barrier to be used for public water supply from which water flows by <br /> gravity or is pumped to a Class I reservoir prior to final entrance to a water <br /> treatment plant. <br /> Stream Order - A ranking of the relative sizes of streams within a watershed <br /> based on the nature of their tributaries. The smallest unbranched tributary is <br /> called first order, the stream receiving the tributary is called second order, and so <br /> on. <br /> Amended <br /> 1/4/94 Watersupply Watershed (or Protected Watershed) Land that drains to existing <br /> reservoirs which are public water supplies or potential reservoir sites or stream intakes <br /> which have been designated for protection. All such lands have been classified by the <br /> Environmental Management Commission as WS-II, WS-III or WS-IV watersheds and <br /> require protection in accordance with the State Mandate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.