Browse
Search
Agenda - 06-01-2010 - 4k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 06-01-2010 - Regular Mtg.
>
Agenda - 06-01-2010 - 4k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 9:35:49 AM
Creation date
5/28/2010 12:43:32 PM
Metadata
Fields
Template:
BOCC
Date
6/1/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4k
Document Relationships
Minutes 06-01-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
97 <br />Gainesville Regional Utilities, Waste -to- Energy Consulting Services, FL. Consultation <br />Services for Renewable and Waste to Energy Options. <br />Gaston County, General Engineering Services, Gastonia, NC. Project Principal. All <br />services provided relating to implementation, expansion, closure, and construction of the <br />County's solid waste disposal facilities. <br />DeKalb Co. Transfer Station, Demolition & Rough Grading Approval Assistance, GA. <br />Sr. Civil Engineer. DeKalb County Transfer Station Demolition & Rough Grading and <br />Regulatory Approvals, Preliminary and Final Design/Bid. <br />Lee County, Lee County Resource Recovery Facility Unit 3 Expansion, FL. HDR was <br />selected by the County as their Consulting Engineer to 1) develop a financial feasibility <br />study for the proposed facility expansion, and 2) design and provide construction <br />administration of the expansion. Unit 3 (the third combustion train) will handle an <br />additional 636 tpd of waste and generate an additional 19 megawatts of electricity. The Unit <br />went on line Fall of 2007. HDR is also providing monitoring and annual reporting of the <br />WTE facility. <br />Orange County Govt., North West Transfer Station, FL. Engineering services for the <br />design, permitting and construction of a new solid waste transfer station and ancillary <br />facilities in the northwest portion of the County. <br />Southeastern Public Service Authority, SPSA General Services, Suffolk, VA. Project <br />Principal. Landfill development and operations, steam plant modifications and operations, <br />and RDF facility modifications and operations. Projects include landfill expansion and <br />development, transfer station upgrade and maintenance, combustion facility maintenance and <br />retrofit, and new facility design and construction. <br />Sumter County, Landfill Closure. Project Manager. HDR was selected to provide Sumter <br />County with consulting services related to closure of their existing landfill. <br />Town of Mount Pleasant, Solid Waste Collection Study, Mt. Pleasant, Mount Pleasant, <br />SC. Project Manager. HDR will evaluate the impacts associated with the direct haul of all <br />waste to the Bee's Ferry Landfill should the resource recovery facility close. <br />USACE - Savannah (Ft. Bragg), Ft. Bragg Bldg No. 2 -1138 HVAC Upgrade, Fort <br />Bragg (U.S. Army), NC. Contract Manager. Replace HVAC System, Bdg 2 -1138 (Ft. <br />Bragg) <br />USACE - Savannah (Ft. Bragg), Renovate ARHOC Barracks Bldg M4540, Ft. Bragg, <br />Fort Bragg (U.S. Army), NC. Contract Manager. HDR will provide professional services to <br />develop construction documents (drawings and specifications) to renovate and repair <br />Barracks Bldg M -4540. <br />USACE - Wilmington District, WilmCOE- Millingport School Sewer, NC. Project <br />Manager. This Task under an On -Call Contract is to prepare Plans and Specifications for <br />Millingport Elementary School Wastewater Collection System in Stanly County, NC. <br />Robert J. Rella - Page 2 fal <br />
The URL can be used to link to this page
Your browser does not support the video tag.