Orange County NC Website
94 <br />Southeastern Public Service Authority, Chesapeake, Virginia. Transfer station floor <br />rehabilitation using 10,000 psi micro- silica concrete. Transfer station site modifications <br />including pump station, force main, refueling station and other site work. <br />Greenville County, South Carolina. Senior technical advisor for the Twin Chimneys <br />landfill permitting, design, constuction, and infrastructure development. <br />Charleston County, Bees Ferry Landfill - Permitting/Design and Construction, <br />Charleston, SC. Project Manager for the lined expansion of the County's existing MSW <br />landfill. The site is comprised of over 300 acres, and the work consists of preliminary <br />design and planning, all permitting, and development of construction plans for the lined <br />expansion. The design included airspace optimization by piggybacking the new liner <br />system over old waste. <br />Charleston County, Bees Ferry Landfill - Permitting /Design and Construction, <br />Charleston, SC. Project Manager for modification of the County's MSW permit for the <br />unlined landfill. Work included revised grading to reclaim an area that had received <br />waste, and revision of the phasing and grading plans to better incorporate the proposed <br />lined expansion. <br />US 17 South Landfill (Proposed), Charleston, South Carolina. Project Manager for the <br />proposed US 17 South MSW Landfill located in western Charleston County. This site <br />comprised over 750 acres. The work included preliminary design and planning, <br />hydrogeologic investigations, wetland delineation, and initial solid waste permitting <br />thorugh SCDHEC. The project was deferred in favor of expanding the County's existing <br />landfill. <br />York County Solid Waste Management Plan Update, York County, SC. Project <br />Manager for the County's solid waste management plan update. Work included <br />facilitation of a 14 member citizen's advisory committee, review of emerging waste <br />management technologies, evaluation of landfill needs, establishment of landfill siting <br />criteria, and presentation of findings to County Coucil. <br />Three Rivers Solid Waste Authory, Title V Permit Renewal Application, SC. Project <br />Manager for the Three Rivers SWA in developing a complete Title V permit renewal <br />application for submittal to the SCDHEC BAQ. <br />Williamsburg County Landfill Partnership, Williamsburg County, SC. Project <br />Manager for the County helping evaluate options to develop a lined MSW landfill facility <br />involving Public - Public or Public - Private partnership(s) for permitting, design, financing, <br />construction, and operations. Work is ongoing at this time. <br />Williamsburg County Landfill, SC. Project Manager for various solid waste projects <br />including feasibility studies for expansion of the County's landfill and privatization of the <br />waste stream. Design Engineer for C &D permits. <br />Georgetown County, Sanitary Landfill Expansion, Georgetown, SC. Design Engineer <br />for the 40 -acre lined expansion. The design included base liner system, leachate collection <br />system, and on -site pretreatment of leachate. <br />Horry County, Sanitary Landfill Expansion, Conway, SC. Design Engineer for the 27- <br />acre lined expansion. The design included base liner system, leachate collection system, <br />and on -site pretreatment of leachate. <br />Sarasota County BOCC, On Call Solid Waste Services, FL. Project Principal and <br />Senior Technical Advisor for a variety of projects including the 55 acre Phase II expansion <br />permitting and design, borrow studies, airspace analyses, landfill gas to energy feasibility <br />studies, Phase I partial closure permitting and design, and sustainability studies related to <br />development of an eco park on and adjacent to landfill property. <br />Joseph C. Readling - Page 3 i al <br />