Orange County NC Website
Education <br />Bachelor of Science, Civil <br />Engineering, University of North <br />Carolina at Charlotte, 1994 <br />Professional Registrations <br />Professional Engineer - Civil, <br />North Carolina, No. 025495 <br />Issued: 01/3112000 <br />Professional Affiliations <br />Solid Waste Association of North <br />America (SWANA), North <br />Carolina, Member, 20042007 <br />HDR Tenure <br />10 Years <br />Michael D. Plummer, P.E. <br />Senior Project Engineer <br />Professional Experience <br />Mr. Plummer has 15 years of experience in solid waste and industrial landfill projects. His <br />experience includes landfill master planning and disposal options, design hydrogeologic <br />site investigations, permit applications, landfill design, construction quality assurance, <br />contract documents, and construction estimates. Prior to performing landfill work, <br />Mr. Plummer worked in the geotechnical field performing geotechnical subsurface <br />explorations and foundation bearing analysis for a variety of structures. <br />HDR Project Experience <br />City of Greensboro, Greensboro Phase 3; Landfill, Greensboro, NC. Project <br />Manager /Project Engineer. Has provided a variety of consulting services. Tasks include <br />master plan development of the landfill, in addition to designing and constructing the <br />Phase III landfill gas collection/distribution systems and leachate recirculation system. <br />Conducted landfill audits which resulted in NCDENR award to the client. <br />City of Greensboro, White Street Landfill, Greensboro, NC. General Project Manager <br />Industry Tenure and Design Engineer. Project activities include conducting landfill audits (which resulted <br />15 Years in an award by NCDENR to the Client), design and permitting of a leachate recirculation <br />system with gas recovery capabilities for Phase III, Title V and annual emission reporting <br />for the facility, investigation into and providing operation assistance for the Phase II gas <br />system, design of the Phase III gas system masterplan, project management for the Phase <br />III Flare bidding, award, and installation, management of the construction of the 14 -acre <br />Cell 3 and Phase A of the Phase III gas system and the connection into an industrial users <br />gas pipeline. <br />Conducted a Construction and Demolition debris landfill masterplan for the facility. The <br />masterplan evaluated the completion of Phases II and III with respect to the schedule for <br />developing Phase W under varying disposal tonnages. <br />City of Winston - Salem, Hanes Mill Road Landfill, Winston - Salem, NC. Project <br />Manager/Engineer. Project activities include the design and permitting of a Subtitle D 14- <br />acre baseliner system and 40 -acre closure. Responsibilities for the cell expansion and <br />closure included analysis, design, and details. Additional responsibilities included <br />preparation of bid documents and specifications for the project and providing designer <br />assistance during construction and certification submittal. <br />City of Winston - Salem, Hanes Mill Road LF - Continuous Assistance, Winston - <br />Salem, NC. Project Engineer. HDR will provide the City of Winston -Salem with <br />continuous assistance in planning, maintaining and operating the Hanes Mill Road and Old <br />Salisbury Road Landfills. <br />City of Winston - Salem, Old Salisbury C &D LF - Permitting the Second 5 -Year Cell, <br />Winston- Salem, NC. General Project Manager. Project activities have included managing <br />the construction of the C &D landfill's 14 -acre Phase III and 25 -acre Phase IV, permitting <br />the vertical expansion of Phases I, II, and III and the lateral expansion into Phases IV, V, <br />and VI. In addition, operational assistance has been provided by permitting the site for a <br />Mining Permit to manage their excess overburden, perform annual airspace reports to <br />