Browse
Search
Agenda - 06-01-2010 - 4k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 06-01-2010 - Regular Mtg.
>
Agenda - 06-01-2010 - 4k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 9:35:49 AM
Creation date
5/28/2010 12:43:32 PM
Metadata
Fields
Template:
BOCC
Date
6/1/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4k
Document Relationships
Minutes 06-01-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�} 51 <br />General Engineering and Environmental Management Services <br />Dekalb County, Georgia <br />center to host tours of the facility. <br />In 2004, DeKalb County selected HDR to be their solid waste consultant. <br />One of the first assignments requested by the County was the design of <br />new state -of -the -art transfer station to replace their existing transfer station <br />and abandoned solid waste incinerator, located in the County <br />administrative complex. <br />HDR proceeded with the planning and the development of a 1700 ton per <br />day transfer station and administrative services complex. This effort <br />included the design of a new 40,000 square foot transfer station facility and <br />adjacent 21,000 square foot administration /office building. The <br />administrative /office building is also designed as a training and information <br />HDR services included site evaluation, permitting, engineering, design, construction administration and construction <br />monitoring activities. The project work included the demolition and remediation of an existing incinerator. Siting issues <br />included stream buffer requirements and the removal of invasive plant species. Design was completed at the end of <br />2006, and construction completed in December 2008. Full operations were initiated in January 2009. <br />Staten Island, New York <br />Page 36 IER <br />
The URL can be used to link to this page
Your browser does not support the video tag.