Browse
Search
Agenda - 06-01-2010 - 4k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 06-01-2010 - Regular Mtg.
>
Agenda - 06-01-2010 - 4k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 9:35:49 AM
Creation date
5/28/2010 12:43:32 PM
Metadata
Fields
Template:
BOCC
Date
6/1/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4k
Document Relationships
Minutes 06-01-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
45 <br />General Engineering and Environmental Management Services <br />HDR has also been selected by Sarasota County to provide <br />landfill gas to energy ( LFGTE) services at the CCSWDC. <br />HDR has been supporting conceptual development of a <br />landfill gas -to- energy facility, which included a study that <br />clearly showed that the County's revenue potential would be <br />maximized through County development as opposed to a <br />developer -owned structure. HDR will assist the County with <br />project development and permitting, assist with the <br />procurement of major equipment, prepare construction <br />packages for phased execution of the LFGTE facility, <br />provide LFGTE construction bidding services, provide <br />system start -up services including training and testing, and <br />provide construction administration services. <br />Other assistance provided by HDR for the Sarasota County solid waste program include estimating the useable <br />remaining volume within Phase I, preparing financial assurance cost estimates, preparing operational fill plans for Phase <br />I, land use planning for the CCSWDC, and providing borrow soil requirement estimates for all phases of landfill <br />development. <br />Page 30 f al <br />
The URL can be used to link to this page
Your browser does not support the video tag.