111
<br />Sarasota County BOCC, Remaining Airspace Analysis, FL. Project Engineer...
<br />Performed detailed analysis of the remaining useable capacity within a landfill and estimates
<br />of when the capacity would be exhausted.
<br />Sarasota County BOCC, Additional Phase II Design, Permitting, and Bidding Services,
<br />FL. Project Manager. Phase H Design, Permitting, and Bidding Services Out -of -Scope
<br />Work Sr. Project Engineer. Review RFPs received by the County for the use of Landfill Gas
<br />from the Bee Ridge Landfill to produce energy.
<br />Sarasota County BOCC, Continuing Professional Engineering Services, FL. Project
<br />Manager. Provide Sarasota County with engineering services to prepare 75 percent complete
<br />permit documents for the final closure of Phase I of the Central County Solid Waste
<br />Disposal Complex (CCSWDC) Class I landfill.
<br />Sarasota County BOCC, Phase II Cell Expansion, Misc. Services, FL. Sr. Project
<br />Engineer. Provide Sarasota County with miscellaneous on -call services related to the design
<br />and permitting of Phase II of the Central County Solid Waste Disposal Complex in Sarasota,
<br />Florida.
<br />Sarasota County BOCC, Phase II Design, Permit, Bid Solid Waste Disposal Complex,
<br />FL. Project Manager. Provide Sarasota County with design, permitting, and bidding services
<br />associated with Phase II of the Central County Solid Waste Disposal Complex in Sarasota,
<br />Florida.
<br />Sarasota County BOCC, Phase II Expansion, Preliminary Design, FL. Project Engineer.
<br />Prepare preliminary design, preliminary construction cost estimate, implementation
<br />schedule, and detailed scope of services for Phase II of the Central County Solid Waste
<br />Disposal Complex (CCSWDC) in Sarasota, Florida.
<br />Sarasota County BOCC, Phase II Landfill Cell Design, Permitting, and Bidding, FL.
<br />Project Manager. Provide Sarasota County with additional engineering services related to the
<br />Phase II landfill cell design, permitting, and bidding.
<br />Sarasota County BOCC, Phase II, Hydrogeological Study, FL. Develop and implement a
<br />hydrogeological study for a 60 acre landfill expansion project including drilling activities,
<br />piezometer installation, laboratory testing, and geotechnical and hydrogeological analyses.
<br />Sarasota County BOCC, Updated Financial Assurance Cost Estimate, FL. Project
<br />Manager. Provide Sarasota County with updated Financial Assurance Cost Estimate (FACE)
<br />forms for the Central County Solid Waste Disposal Complex (CCSWDC) Class I landfill
<br />and the Bee Ridge closed landfill.
<br />Southeast Industrial Land Services Inc., Oconee County C &D Landfill, GA. Sr. Prj.
<br />Engineer. HDR conducted a hydrogeological study as part of a Site Acceptability Report
<br />submitted to the State of Georgia. HDR was previously involved in analyzing this site for the
<br />possibility of a landfill. The site was subsequently deemed acceptable for a construction and
<br />demolition landfill. Other responsibilities included public involvement, including
<br />participating in meetings with county commissioners, state regulators, and attorneys.
<br />Currently HDR is designing this C &D Landfill.
<br />St Johns County, Waste Transfer Station, FL. Sr. Project Engineer. HDR was retained by
<br />St. Johns County to design, permit and construct a new solid waste transfer station at a
<br />property located near US 1 and Stratton Road in St. Johns County, Florida. The transfer
<br />station facility was permitted and designed to handle a throughput of 1000 tons /day of
<br />municipal solid waste. St. Johns County required planning and layout of the facility to
<br />accommodate future rail operations, and required connection improvements to US -1 and
<br />railroad crossing upgrades.
<br />Thomas M. Yanoschak - Page 2 1 L.l
<br />
|