Browse
Search
Minutes - 19831003
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1983
>
Minutes - 19831003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 10:16:09 AM
Creation date
8/13/2008 12:38:51 PM
Metadata
Fields
Template:
BOCC
Date
10/3/1983
Meeting Type
Regular Meeting
Document Type
Minutes
Document Relationships
Agenda - 10-03-1983
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
foie i tet-it�Cest•streams . `" <br /> bozo also has' c.�r <br /> streams. ` Carr U C <br /> --- -, -- ---- 112 <br /> - habitat o h and <br /> 6. To rycotect and maintain. the ewcstc.rig � {� ' I <br /> 7. Ta ptevent damage 6nom Jtood irng white neeognriZ ng that <br /> natuUZ 6tuctuatione in wwten QevdA ane bene6.ici - <br /> ts. To Wtect the abbo4tiv4 pu4i6ying and netenrtive 6unction4 o6 <br /> the natzwt eystems exc,a•ting in the UnZveA6 ty Lake WateAAhed <br /> a/ea. 1=: <br /> 9. To ¢nsune the attainment o6 these objectives by nequ.uuing the <br /> appnovat and .imptemenrtation o6 sedimentation and vws Zan cont7ot j. <br /> pears 6o,% atC activitim which may advenael'y a65ecrt the <br /> uniive#A ty Lake Watershed. I <br /> 10. To pnov-ide and en6otee deb.ign and per6onmance standards 6o& : I <br /> contAot o6 post-development enoa.ion and sedimentation in atdeA <br /> to pfceserve the ciuvracvdAt.Ics that existed in the. LlnriveluZty <br /> Watershed Area prior to devetopment. �I <br /> Section 3 Definitions <br /> As used in this ordinance, unless the context clearly indicates otherwise, <br /> the following definitions apply: <br /> I a. Accelerated Erosion - means any increase over the rate of natural i <br /> erosion as a resu t of land-disturbing activities.' <br /> b. Acre - means 43,560 square feet.. <br /> c. Adequate Erosion Control-Measure. Structure, or Device'- means one <br /> which controls the soil material within the land area. 1 <br /> d. A lgricultura I Land - is land used primarily for the production of plants �!! <br /> and animas and intended for private consumption or sale, including <br /> but not limited to forage and sod crops, grain and feed crops, tobacco, F:;I <br /> cotton, and peanuts; dairy animals and dairy products; poultry and <br /> poultry products; livestock, including the breeding and grazing of any <br /> or all such animals; bees and apiary products; fur animals. <br /> material which is required for on <br /> canstruction <br /> e. Borrow means fill q <br /> a`d is obtained from other locations. <br /> f. Buffer Area- means the strip of land adjacent to a lake or natural <br /> watercourse. The boundaries and purposes of which are as set forth <br /> it <br /> in Section 8.lh. <br /> • i <br /> g. Channet - a natuAat on a4ti6.iciat wartencomue with a dejbtite bed and <br /> n .a M con6.1,ne and conduat 6Cow v6 ulatcA. <br /> I <br /> h. Chatutet Attehati.ons - a chazige o6 the w2ten-ccwcyu1g cat ati;ty on Stoto If <br /> VWRaU"t4Z6 o a natural on auti6•icat eluuutel by c1eaxing, excavation, <br /> bantz atabiZtzation oh othm measta. �I <br /> Z Cluumet S.tab.iti.zation - eno.6ioit peeve Luton and stabiUzanon o6 ve.tocity ;111 <br /> utcon W a c unmet using jettie6, drops, revetments, vegetation, <br /> and othez meaauneA. <br /> T <br /> Jar•=:._ � �+Y,:: <br />
The URL can be used to link to this page
Your browser does not support the video tag.