Browse
Search
ORD-2007-072 - Fiscal Year 2007-2008 Budget - Capital Project and Grant Project Ordinances
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2007
>
ORD-2007-072 - Fiscal Year 2007-2008 Budget - Capital Project and Grant Project Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 12:02:09 PM
Creation date
5/28/2010 10:31:31 AM
Metadata
Fields
Template:
BOCC
Date
6/26/2007
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
6a
Document Relationships
Agenda - 06-26-2007-6a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 06-26-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/18/2007 <br /> Information Technology Capital Project <br /> Fiscal Year 2007-08 Capital Funding Recommendation <br /> Requesting Estimated Runnin g <br /> Department <br /> Technology Initiative Cost Total Benefit <br /> 11 Health Permits Plus Customizations 35,000.00 622,550.00 Increased collection rates, reduced wait times for customers <br /> Information Have professional designer redesign home page,Template, <br /> 12 Technologies Web Upgrades 13,000.00 635,550.00 prepare those changes for ongoing IT maintenance. <br /> Also, hire professional photographer to provide high quality photos <br /> for ima a library <br /> 13 Information Hot S Create outdoor accessible wireless hotspots at SHSC and Cedar <br /> Spots Technologies p 6,000.00 641,550.00 Grove to allow synchronization of field technology(Sheriff deputies, <br /> D Ins ections, Tax Assessor,Animal Control <br /> Information <br /> m 14 p <br /> Laptop Replacement 90,250.00 731,800.00 Replace about 45 laptops(8+years old) in computer fleet <br /> a Technologies <br /> X <br /> D 15 Information Redundant HBA cards and Ensure high availability of SAN based servers in the event of HBA <br /> Technologies Fabric for SAN 25,000.00 756,800.00 <br /> � or fabric failures <br /> m <br /> Q 16 GIS Public Workstations 3,600.00 760,400.00 Public Inquiry Workstations need to be replaced. Old ones are <br /> failin . <br /> 17 Cooperative Printers <br /> Extension 8,000.00 768,400.00 Replace aging printers that are on the verge,of death <br /> 18 EMS CAD system workstation <br /> replacements 22,000.00 790,400.00 Replace aging CAD workstations <br /> 19 EMS Emergency Notification System 53,000.00 843,400.00 To be able to notify public directly via phone and by geographic <br /> proximity to event, of emergency situations <br /> 20 Library Replacement Computers 6,600.00 850,000.00 Replace aging computers for Library not otherwise eligible among <br /> current replacement schedule <br /> 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.