Orange County NC Website
• 16 <br /> development rate and the post-development stormwater runoff volume shall not exceed <br /> the pre-development volume for the local 2-year frequency,24-hour duration storm event. <br /> Engineered stormwater facilities shall also remove 85% total suspended solids and.treat <br /> the first inch of precipitation utilizing NC Division of Water Quality design standards. <br /> 30. Stormwater Facility Prohibited in the Public Right-of-Way: That all detention/retention • <br /> basins,stormwater facilities and associated infrastructure be located outside of existing or <br /> proposed rights-of-way as well as outside of all building setbacks. <br /> 31. Storm Drainagewav Easement: That all stormwater management improvements, outside <br /> the public right-of-way, shall be located inside reserved storm drainageway easements <br /> and shown on the final plans and final plat,per Town guidelines. <br /> 32. Stormwater Operations and Maintenance Plan: That the applicant shall provide a <br /> Stormwater Operations and Maintenance Plan for all engineered stormwater facilities. • <br /> The plan shall include the owner's financial responsibility and include the maintenance <br /> schedule of the facilities to ensure that it continues to function as originally intended and <br /> shall be approved by the Town Manager, prior to the issuance of a Zoning Compliance <br /> Permit. The Stormwater Operations and Maintenance Plan shall be referenced in the <br /> Homeowners' Association documents. <br /> • 33. State or Federal Approvals: That any required State or federal permits or encroachment <br /> agreements must be approved by the appropriate agencies and copies of the approved <br /> permits be submitted to the Town Manager prior to the issuance of a Zoning Compliance <br /> Permit. <br /> 34. Erosion Control: That a detailed soil erosion and sedimentation control plan, including <br /> provision for monitoring and maintenance of facilities and modifications of the plan if <br /> necessary, be•approved by the County Erosion Control Officer and the Town Manager <br /> prior to issuance of a Zoning Compliance Permit. ' <br /> If one (1) acre or more is uncovered by land-disturbing activities for this project, then.a <br /> performance guarantee in accordance with Section 5-97.1 Bonds of the Town Code of <br /> Ordinances shall be required prior to final authorization to begin land-disturbing <br /> activities. This financial guarantee is intended to cover the costs of restoration of failed <br /> or failing soil erosion and sedimentation controls, and/or to remedy damages resulting <br /> from land-disturbing activities, should the responsible party or parties fail to provide <br /> prompt and effective remedies acceptable to the Town. <br /> 35. Silt Control: That the applicant takes appropriate measures to prevent and remove the <br /> deposit of wet or dry silt on adjacent paved roadways. <br /> Stipulations Related to Resource Conservation District <br /> 36.Ephemeral Stream Channels: As part of the Stormwater Management Plan, the applicant <br /> shall identify ephemeral stream channels, demonstrate the necessity of land disturbance <br />