Browse
Search
Minutes - 19830523
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1983
>
Minutes - 19830523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 9:31:37 AM
Creation date
8/13/2008 12:37:45 PM
Metadata
Fields
Template:
BOCC
Date
5/23/1983
Meeting Type
Regular Meeting
Document Type
Minutes
Document Relationships
Agenda - 05-23-1983
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Note. Construction of a Private Road must confrom with the requirements of the <br /> ' Orange County Sedimentation and Erosion Control Ordinance. This ordinance requires <br /> that precautions be taken to pervent damage by soil erosion or sedimentation regard- <br /> less of the amount of land disturbance. When the amount of land disturbance exceeds <br /> 20,000 square feet, the property owner or his agent is required to obtain the <br /> necessary permits and to pay the appropiate fees. Generally, permits and fees are <br /> required when the length of the Private Road exceeds 1,000 feet for a Class C road, <br /> .770 feet for a Class B road or 570 for a Class A road. The permit must be <br /> obtained before construction. begins. gontact the Erosion Control Officer for <br /> assistance. <br /> .GTJEMA . SETBDMSION APPROVAL MUENCE . <br /> Submit request for subdivision and Private Road to Orange County Planning <br /> Department. Check proposed road name with Planning Department list to avoid <br /> duplication. <br /> j <br /> i <br /> Apply f3br grading permit if land disturbance invlcves more than 20,000 I <br /> square feet. <br /> Receive subdivision approval. <br /> ' Construct road to Orange County standards or post security band for <br /> construction of the road. �I <br /> Record final subdivision plat with Register of Deeds. <br /> GENERAL CONSTRUCTION SEQUENCE <br /> I Contact Planning Department before beginning construction so inspections <br /> can be scheduled. Remove all trees, stumps, roots and other vegetation from the <br /> width of.zight-o`-way necessary to construct the road to the required dimensions. <br /> Fill and compact all depressions created by clearing. j <br /> Build roadbed to required dimensions, cutting, filling and compacting where <br /> necessary for a desirable grade. <br /> Install culverts to provide cross drainage. <br /> Construct side ditches and crown travelway. <br /> Place and compact 4" of surface material. <br /> Seed and mulch disturbed areas. <br /> Install road name sign. <br /> Final inspection by Planning Department. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.