Orange County NC Website
general retail uses that are more compatible for <br /> use of individual septic and well systems for <br /> utility provision. <br /> As outlined under the P-ROS, section mixed use <br /> development projects are possible within this <br /> zone subject to project approval through the <br /> Conditional Use permitting and review process at <br /> such time residential land uses are made <br /> operative by land use and zoning amendments. <br /> IMPERVIOUS SURFACE AREA— BUCKHORN DISTRICT: <br /> The total amount of impervious surface covered by buildings <br /> and parking lots is limited to 70% of a building site. As <br /> shown on the schematic plan, stormwater control for multiple <br /> sites may be provided through construction of several <br /> detention basins, located along individual streams draining <br /> the district, particularly an the north side of the interstate (as <br /> shown on the schematic plan). Alternatively, a larger, single <br /> detention basin could be constructed on the south side of 1- <br /> 85 at or below the confluence of the streams. Detention <br /> basins may also be constructed on individual sites. <br /> Impervious surface limits and standards for detention basin <br /> construction and maintenance are discussed further in <br /> Section 2.3 - Land Intensity and Appendix C - Wet Detention <br /> Basin Standards, respectively. <br /> 6 <br />