Browse
Search
ORD-2007-019 - Text Amendment Orange Co Zoning Ord Section 6.29 relating I-85 Buckhorn Rd Economic Development District
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2007
>
ORD-2007-019 - Text Amendment Orange Co Zoning Ord Section 6.29 relating I-85 Buckhorn Rd Economic Development District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 12:08:19 PM
Creation date
5/20/2010 3:22:54 PM
Metadata
Fields
Template:
BOCC
Date
5/21/2007
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
C.6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ECONOMIC DEVELOPMENT DISTRICTS DESIGN MANUAL SECTION 2.3 <br /> (ZONING ORDINANCE SECTION 6.29.3) <br /> Proposed Amendment <br /> The case study- Land Use Intensity <br /> The Prototype Plan <br /> The prototype plan used by the Introduction <br /> developer in other communities is an In section 2.1 —Development Areas, schematic plans were <br /> office complex consisting of four one- presented to illustrate the desired balance between economic <br /> story office buildings clustered around a development and environmental protection. In this section, <br /> parking court. To determine if the intensity standards are introduced which seek to carry this <br /> prototype plan will fit the site, the approach one step further by defining an acceptable three- <br /> developer reviewed the recommended dimensional spatial relationship between natural features and <br /> Ast of ordinances, technical reports and man-made construction. Stated differently, Intensity standards <br /> other documents contained in Appendix seek to define the degree to which a parcel of land may be <br /> A and drew up the following list of used. <br /> design constraints. <br /> To assist the user in applying the intensity standards described <br /> -Building and parking lots must not be in this section, a"case study"is presented, using the <br /> located in floodplain areas. development scenario described in the Introduction section of <br /> - The bottomland hardware forest must this Manual. First, however, a brief description of some more <br /> not be disturbed. traditional approaches to measuring intensity is presented to <br /> - The remaining woodlands must be help the reader understand the evolution to the intensity <br /> disturbed only to the extent necessary concepts of impervious surface ratio(ISR), building volume <br /> to fit the building and parking to the ratio(81/11), landscape volume ratio (LVR), and site volume <br /> site. ratio (SVR). <br /> - The frontage road Is to be widened <br /> from a 60-foot right-of-way to a 100 New Approaches (2007) <br /> feet section,requiring the dedication In order to offer flexibility in the design of larger projects that <br /> of 20 feet of right-of-way. become major employment centers and to update <br /> - Buildings must be set back at least 25 performance standards that are now in 2007 more widely <br /> feet from the new property(right-of- accepted the following land use master planning smart <br /> way)line. growth principles including performance standards are <br /> available to non-residential projects Incorporation of these <br /> By applying these constraints and aspects will support the EDD application and the balance with <br /> placing the prototype plan on the site, traditional approaches. <br /> the developer learns that the prototype <br /> will not'flt and revisions must be <br /> made. <br /> Economic Development Districts Design Manual Page 2.3.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.