Browse
Search
ORD-2007-017 - Sedimentation and Erosion Control Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2007
>
ORD-2007-017 - Sedimentation and Erosion Control Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2011 1:25:36 PM
Creation date
5/20/2010 2:32:05 PM
Metadata
Fields
Template:
BOCC
Date
5/21/2007
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
C.4
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County SE & SC Ordinance °°^'°~.~...b~,-is-2oB°~Seotember 12.20b6 <br />Section 18.1 Erosion Control Standards <br />A. Orange County Standards <br />Requirements, standards, and specifications for erosion control plans and erosion <br />control techniques, measures, and devices are contained in the Orange County Soil <br />Erosion and Sediment Control Manual. Copies of the Manual are available from the <br />Erosion Control Division of the Orange County Planning & Inspections Department. <br />B. Revisions to the Standards <br />Corrections, revisions, and amendments to the Soil Erosion and Sediment Control <br />Manual shall be made upon recommendation of the Erosion Control Officer and <br />approval by the Orange County Board of Commissioners. <br />C. Consistency Between Ordinance and Standards <br />Nothing in this Section shall be construed to allow approval of a plan which is <br />inconsistent with the mandatory standards set forth in Section 8 of this Ordinance or <br />any other provision of this Ordinance. <br />SECTION 19 APPEALS <br />A. Appeal Process <br />Except as provided in Section 19(B) of this Ordinance the appeal of a disapproval or <br />approval with modifications or conditions of approval of a plan shall be governed by <br />the following provisions: <br />The disapproval of, modification of, or conditions of approval attached to any <br />proposed Erosion Control Plan by the Erosion Control Officer shall entitle the <br />person submitting the plan to an appeal of the decision to the Orange County <br />Planning Director. If the Planning Director upholds the decision, the person shall <br />be entitled to a public hearing if such person submits written demand for a hearing <br />within 15 days after receipt of written notice of disapproval, modification, or <br />conditions of approval. <br />Hearings-Orange County <br />a. Hearings held pursuant to this section shall be conducted by the Orange <br />County Planning Board within 30 days after receipt of written demand for <br />such hearing made by the person submitting the plan when such plan is for <br />land-disturbing activities occurring outside the corporate limits of the Towns <br />of Chapel Hill, Carrboro, Hillsborough, and Mebane. <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.