Browse
Search
ORD-2007-010 - Carrboro High School Chapel Hill Carrboro City Schools Capital Project Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2007
>
ORD-2007-010 - Carrboro High School Chapel Hill Carrboro City Schools Capital Project Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2011 12:59:59 PM
Creation date
5/18/2010 10:10:15 AM
Metadata
Fields
Template:
BOCC
Date
4/24/2007
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
4g
Document Relationships
Agenda - 04-24-2007-4g
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 04-24-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~o <br />6. CHCCS High Performance Standards. Design standards shall comply with the <br />high performance building design criteria in School Board Policy 9040. <br />7. Public Road Improvement Standards. Endorse the timely construction of road <br />improvements to Smith Level Road and intersection improvements to the <br />intersection of Rock Haven Road and Smith Level Road which improvements have <br />been endorsed by Carrboro and Orange County and which improvements, if timely <br />constructed, will reduce by as much as.$250,OOO the offsite road improvement cost <br />to CHCCS in its construction of CHCCS high school #3. <br />8. Transportation Enhancement Standards. Reduce dependency on the <br />automobile for school functions and to reduce vehicle miles traveled related to <br />school functions by committing at least $300,000 of capital from the amount <br />appropriated to the Construction line item of Section 4 to: <br />a. the purchase of buses or shuttles to be owned by CHCCS or otherwise, in <br />tandem.with the development of an enhanced transportation system, for <br />school uses and functions, including student, staff and teacher transportation <br />to and from school and student, staff, teacher and visitor transportation to and <br />from preschool and afterschool programs; <br />b. contributions of funds and expertise to the evaluation and development of <br />the use of Chapel Hill Area Transit and/or Orange Public Transportation to <br />provide non-automobile alternatives for transportation of students, staff, <br />teachers and visitors to and from school, preschool and afterschool programs; <br />c. the purchase of transit software to be used to reduce vehicle miles traveled <br />in future redistricting decisions; <br />d. promote walking to and from school and pre and after school programs by <br />funding with matching grants the construction of sidewalks in Carrboro and <br />Chapel Hill located within 1.5 miles of CHCCS high school #3 (the school "walk <br />zone") which sidewalks are likely to be constructed by Carrboro and Chapel <br />Hill only in response to matching grants; <br />e. promote bike riding to and from school and pre and after school programs <br />by funding with matching grants the construction of bike lanes in Carrboro and <br />Chapel Hill within the attendance district of CHCCS high school #3 which bike <br />lanes are likely to be constructed by or at the request of Carrboro and Chapel <br />Hill only in response to matching grants; <br />f. promote bus and other transit transportation to and from school and pre <br />and after school programs by funding the construction of weatherproof shelters <br />(considering climate controlling them) at locations within the attendance district <br />of CHCCS high school #3 adjacent to or conveniently close to park and ride <br />locations established by Carrboro, Chapel Hill and the University of North <br />Carolina. <br />
The URL can be used to link to this page
Your browser does not support the video tag.