Orange County NC Website
9. All plans for drainage, son erosion and sedimentation <br /> control shall be reviewed and approved by Orange County. The <br /> project shall at all times meet the requirements of the Orange County <br /> Soil Erosion and Sedimentation Control Ordinance. <br /> 10. Dense evergreen screening shall be provided for any <br /> buildings that are not at least 500' from the property lines of the <br /> facility, These lines are the outside perimeter of the property <br /> described in the following conveyances: Deed.Book 196, Page 527 and <br /> Deed Book 126, Page 30, Orange County Registry. This screening <br /> material shall be of sufficient size to provide a 6' hedge within 3 <br /> years of planting. Also acceptable as a screening material is a 6' <br /> birm or a solid wood fence. <br /> 11. Any lighting of the runway or other parts of the airport <br /> necessary for safety or convenience shall be of a design and so <br /> located and screened so as not to create a nuisance to adjoining <br /> Property owners.. <br /> 12. All public improvements shall be maintained'in� ~� <br /> Perpetuity. All documents specifying responsibility for maintenance of <br /> the approved public improvements shall be approved by the Orange <br /> County Attorney. <br /> Rick Cannity, <br /> Acting Planning Director <br /> Orange County Planning Department <br /> /jac <br /> cc: Lee Mehler, <br /> Peloquin Assoc;,. P.A. <br /> John Northen <br /> Kenneth Thompson <br /> Geoffrey E. Gledhill <br /> Richard E. Whitted <br />