Browse
Search
Minutes - 19830215
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1983
>
Minutes - 19830215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 9:42:28 AM
Creation date
8/13/2008 12:36:43 PM
Metadata
Fields
Template:
BOCC
Date
2/15/1983
Meeting Type
Regular Meeting
Document Type
Minutes
Document Relationships
Agenda - 02-15-1983
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
other stationed in the T-hanger area of each phase; (6) a contribution <br /> to Fire Company in an amount not to exceed $10,000 to enable Fire <br /> Company to purchase a water pump to be mounted either on a Fire <br /> Company trailer or truck. This amount is payable on demand upon the <br /> issuance to applicant of any building permits (7)' the following safety <br /> features must be adhered-to by applicant: (a) the T-hangers must <br /> contain no open-flatne heaters; (b) no loading or unloading or storage <br /> of fuel shall be permitted in any hanger area; (c) the requirements of <br /> (a) and (b) shall be prominantly displayed in all hanger areas and <br /> incorporated into an Airport Operating Manual which manual shall be <br /> • wade available to all airport users; (d) all FAA safety requirements <br /> pertaining to construction and operation of a public airport the size of <br /> Midway shall be adhered to; (8) a communication system between the <br /> Midway F.B.O. control room and Fire Company shall be installed by. <br /> applicant. <br /> 5. The following construction schedule, shall be adhered-to <br /> by the applicant; Construction of the runway__shaiL.begin...withLn one <br /> year of final approval of• the Special Use Permit and all construction <br /> on the runway shall be completed one year after construction begins. <br /> All construction detailed in phase one of the site. plan and project <br /> narrative will be completed ninety (90) days after completion of the <br /> runway. Phase two will be initiated within six months after the start <br /> of construction of phase one and be completed within two years of <br /> initiation. Phase three will be completed .within two years of <br /> completion of phase two. = <br /> 6. The grantee of this Special Use Permit shall post with <br /> Orange County, in a form acceptable to the County Attorney, a bond <br /> or letter of credit in an amount equal to the cost of construction of <br /> all public improvements, including, but not limited to, grading, clearing <br /> and stabilization. of all areas in public streets and the erection of <br /> street signs, fire ponds and fire fighting equipment, plus 10%. The <br /> amount shall be determined on the basis of fully executed construction <br /> contracts or certification by a registered engineer employed by the <br /> grantee of this Speical Use Permit. Security for construction of the <br /> improvements in this project-may be released according to the phasing <br /> in the project Specifically, as improvements are completed in each. <br /> phase, that phase and a corresponding amount of money may be <br /> released from the security instruments or the security instruments may <br /> be renegotiated .based on the unconstructed portion of the <br /> improvements_ <br /> 7. Flight training operations shall not exceed 50% of the <br /> total operations for the facility. <br /> 8. All necessary easements to permit utility (electricity, <br /> telephone, sewer and water) installation, servicing and hookups to the <br /> development shall be provided at no cost to the utility provider. <br />
The URL can be used to link to this page
Your browser does not support the video tag.