Browse
Search
Minutes - 19830215
>
Board of County Commissioners
>
Minutes - Approved
>
1980's
>
1983
>
Minutes - 19830215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 9:42:28 AM
Creation date
8/13/2008 12:36:43 PM
Metadata
Fields
Template:
BOCC
Date
2/15/1983
Meeting Type
Regular Meeting
Document Type
Minutes
Document Relationships
Agenda - 02-15-1983
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• F <br /> 3. The final site plan and narrative of the project <br /> incorporating all changes, deletions and additions through the final - <br /> approval of the project are incorporated herein and made part of the <br /> Special Use Permit. A copy of the final site plan and narrative are <br /> to be maintained on fie with the Orange County Planning Department. <br /> Only those commercial uses specified in the project narrative and on <br /> the site plan, including but not necessarily limited to the sale of fuel <br /> for aircraft, maintenance service and flight training classes, will be <br /> qW permitted at the airport facility. All improvements as indicated shall <br /> be .constructed according to the construction schedule set up in the <br /> final site plan and narrative. <br /> 4. The following fire protection measures shall be provided <br /> by the applicant: (1) construction of a fire access road to the <br /> property from Tear Road; (2) a 24 hour/day vehicle for security, fire <br /> fighting and maintenance purposes. The vehicle will be outfitted with <br /> master keys, radio system, turn-out gear, portable-Trre- exfmguisher; <br /> fire fighting foam and eirpack. Satisfaction of these requirements <br /> shall be determined by the Chief of the Orange Grove Volunteer Fire <br /> Company (Fire Company) and the County Manager; (3) three ponds <br /> shah be constructed, each capable of supplying 30,000 gallons of water <br /> over a two hour- period. The -water level of each pond shall be <br /> maintained at a level sufficient to supply 30,000 gallons of water over <br /> w a two hour period by the construction of wells and the necessary— <br /> hardware, which would be activated when the water level drops below <br /> the required level.. Drafting .stations shall be located and constructed <br /> to the specifications of the Fire Company with all-weather access <br /> provided. The ponds shall, be constructed in the following locations <br /> and according to the following timetable: pond number one shall be <br /> located 600 feet north of the phase one F.B.O. Hanger and Shan be <br /> completed when phase one construction begins. Pond number two shall <br /> be located 600 feet north of the phase two maintenance hanger and <br /> shall be completed when phase two construction begins. Pond number <br /> three shall be located 400 feet northeast of the phase three <br /> maintenance hanger and shall be completed when phase .three <br /> construction begins; Access. to Midway Airport shall be provided <br /> periodically to the Fire Company and its successors in fire protection <br /> responsibility for training exercises; (4) two hundred gallons of 6% <br /> AFFF foam shall be provided to the Fire Company, a .portion <br /> (determined by the Fire Company) to be kept on the trucks of the <br /> Fire Company and the remaining stored in the airport maintenance <br /> hangers and made available to the Fire Company at all tim es. An <br /> additional 20 gallons of 6% AFFF foam shall be provided to Fire <br /> Company annually for training purposes. Two foam nozzles and <br /> educators, one for a 1--1/2" line and one for a 2-1/2" line shall be <br /> provided to Fire- Company; (5) two portable 50 pound dry chemical fire <br /> extinguishers shall be provided and maintained in each of the three <br /> phases of the Airport. One shall be located in the fueling area, the <br />
The URL can be used to link to this page
Your browser does not support the video tag.