Orange County NC Website
5. Is there filling on the site in a designated floodway area (no sites in the floodway can be <br />certified)? Yes No <br />6. Is there filling on the site in designated flood fringe areas? Yes No <br />If yes, do the filled areas appear to be in compliance with local ordinances or other <br />recognized standards? <br />Is an engineer's certification of filling standards available (required)? <br />Yes No <br />7. Can industrial quality power be made available to the site? Yes No <br />8. Is public water supply within 500 feet of site? Yes No <br />9. Is public wastewater supply within 500 feet of site? Yes No <br />10. Please provide the following visuals to assist in the evaluation of the proposed site: <br />• Site boundary map <br />• Aerial photo of the site <br />• Letter from county government expressing support for the project <br />Letter from local municipality (if applicable) expressing support for the project <br />• If the site / park is located in one of the 20 coastal counties covered by CAMA, in <br />• addition to the above requirements an applicant must submit <br />o- A letter from the Division of Coastal Management (DCM) that validates that <br />the site is consistent with the county's certified CAMA land use plan and <br />allows for industrial development. <br />To request a letter from DCM, please contact John Thayer, Manager of <br />Planning /Public Access, at 252.808.2808, 888.472.6278 or John.Thayer @ncdenr.gov. <br />You may also contact one of the district planners listed below: <br />• Camden, Chowan, Currituck, Dare, Gates, Pasquotank and Perquimans <br />Counties: Charlan Owens, AICP, District Planner, 252.264.3901, <br />charlan.owens @ncdenr.gov <br />• Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties: VACANT <br />Carteret, Craven, Onslow (north of Maureen Meehan Willi e River) <br />252,808.2808,maureenewill @d Pamlico Counties: <br />n d nrgov <br />22 NC Department of Commerce — Certified Sites Program <br />