Browse
Search
Agenda - 05-18-2010 - 8b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 05-18-2010 - Regular Mtg.
>
Agenda - 05-18-2010 - 8b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 9:08:50 AM
Creation date
5/14/2010 4:02:24 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8b
Document Relationships
Minutes 05-18-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o As part of the documentation required for final approval, the community must <br />include the certified CAMA land use plan as part of the site's documentation. <br />site revised letter <br />certification, community provide <br />0 istent wi hthe county s certified <br />from DCM that that the sons <br />CAMA land use plan and allows for industrial development. <br />Sites that are located in an Area of Environmental Concern (AEC) are not eligible for <br />certification as part of the North Carolina Certified Sites Program. <br />To request a letter from DCM, please contact John Thayer, Manager of Planning /Public <br />Access, at 252.808.2808, 888.472.6278 or John.Thayer @ncdenr.gbv. You may also <br />contact one of the district planners listed below: <br />quotank and Perquimans Counties: <br />Charlan Owens, AICP, District Planner, 252.264.3901, <br />charlan.owens @ncdenr.gov <br />O `Beaufort, Bertie, Hertford, Hyde, Tyrrell and Washington Counties: VACANT <br />o Carteret' Onslow (north of the New River) and Pamlico Counties: <br />Maureen Meehan Will, 252.808.2808, maureen.will @ncdenr.gov <br />o Brunswick, New Hanover, Onslow (below New River) and Pender Counties: Mike <br />Christenbury, 910.796.7426, mike.christenbury@ncdenr.gov <br />13. The site must be served by industrial quality power (a minimum of three -phase electric <br />service) The applicant must attach a letter from the power supplier addressing <br />availability and time required to supply three phase electric service to the site <br />14. If ind eating size, feasibility and reliability of s supply and gas, <br />me required for <br />from to market the site as serve <br />supplier <br />extension must be attached <br />15. The site must be served by public water service capable of providing up to 500,000 <br />gallons per day - If the public water infrastructure is not within 500 feet of the site <br />please attach the following documentation: <br />a. Extension engineering design (including cost and schedule) <br />b. A copy of approved State permits for the water system extensions <br />of-Way for the extension have been obtained <br />d. d. Written county Proof that county government comet ment to finance the watery extension upon <br />request for service <br />e. An engineer's cost estimate for extending water service to the site and time <br />required for extension <br />If the water infrastructure is within 500 feet of the site, the applicant must attach a <br />letter from the water service provider certifying that there is a minimum of 500,000 <br />gallons per day of excess permitted capacity available. This letter should also attest to <br />its ability and willingness to provide appropriate service to the proposed site, the size of <br />existing or proposed transmission lines, the available water storage capacities of the <br />system, the static and residual pressures in the vicinity of the site, and the excess <br />Certified Sites Program <br />19 NC Department of Commerce — <br />
The URL can be used to link to this page
Your browser does not support the video tag.