Browse
Search
Agenda - 05-18-2010 - 8b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 05-18-2010 - Regular Mtg.
>
Agenda - 05-18-2010 - 8b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 9:08:50 AM
Creation date
5/14/2010 4:02:24 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8b
Document Relationships
Minutes 05-18-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 Contingency contract to purchase or lease <br />b. A copy of the present deed for the property <br />c. A boundary survey bearing a licensed land surveyor's signed certification is highly <br />recommended, but the minimum standard for the e Program (g is a "compiled" involves <br />inspection survey. This is a survey performed <br />all the steps of a certified boundary survey, including research on all available <br />ion of <br />recorded data about a site, but does not include the onsite, ground survey portion <br />the certified boundary survey. <br />d. The results of a title search showing clear title to the proposed site (the title search <br />y) <br />must encompass at least the prior 50 year histor boundaries of the site <br />e. A county tax map depicting the location and property <br />4. The site must have an established price and terms for its sale or lease The applicant <br />must submit a letter from the owner or controlling entity stating a price and conditions <br />of sale or lease <br />g minimum standards for both site size and percent <br />5. The site must meet the followin <br />buildable: <br />_. aPr�anr of Buildable Acres <br />-.I- O._- 90% <br />25 85% <br />50 75% <br />75 70% <br />15 65% <br />200+ 60% <br />6. The applicant must provide documentation to demonstrate the site's ability to be <br />developed. These attachments must include the following: <br />a. Documentation of any known rights -of -way, easements, judgments, liens, <br />restrictive covenants, and any other items that might impact the entire site's <br />developability <br />b. Phase I environmental audit <br />c. 'A ports(s) t nd indicating g the location ofDwetlands) - If wetlands exist and will be <br />re <br />disturbed, show plan for mitigation, including costs <br />d. Include map(s) and /or report(s) indicating the location of rare or endangered <br />plant and /or animal species <br />e. Include map(s) and /or report(s) indicating the location of archeological findings, <br />historic sites or structures <br />f. Map indicating location of water bodies on site with estimated flow of such <br />bodies <br />T7NC Department of Commerce - Certified Sites Nrogran <br />
The URL can be used to link to this page
Your browser does not support the video tag.