Orange County NC Website
also attest to the providers ability and willingness to provide appropriate service to the <br />proposed collection lines; the size of existing or proposed pumping facilities which are <br />necessary to service the park; the extent of present is presently Huse attthe theatmenty of <br />the park; the type of treatment technology which <br />facility; and the distance which local service must be extended to serve the park. The <br />local supplier of wastewater treatment service must also certify that the proposed park <br />is within 5oo feet of existing wastewater lines and that connection to these wastewater <br />lines is technically and economically feasible <br />17. If the applicant intends to market the proposed park as rail - served, then the applicant <br />must attach a letter from rail provider indicating its willingness to provide rail access to <br />the proposed site, as well as the cost and schedule for extending rail to the site <br />18. The park must be served by telecommunications infrastructure <br />19. The applicant must submit a master development plan that shows the location of park <br />access roads, easements for all utilities (water, sewer, natural gas, electricity, <br />telecommunications), and proposed lot locations and sizes - This Master Development <br />plan should take into consideration and note the location of development limitations, <br />such as wetlands, flood plains and permanent easements <br />It also important to stress that just because the Master Development Plan has been <br />completed the Certified Sites designation does not require a park to be developed as <br />originally planned. We certainly understand the need for the flexib <br />dills this.ub- divide <br />and /or combine parcels for prospective clients and nothing p <br />Industrial Site Certification Criteria <br />L Submit the <br />approved by the steering' form via the <br />before assite is allowed t to <br />move forward withtthe <br />app Y <br />certification process <br />2. The applicant must have a letter ffrom <br />he county commissioners t on proposal fo and/or <br />site icipal <br />government expressing support <br />3. The site available forlabminimum of two yearns. The applicant umu t attach the following <br />for sale or lease to prospective must be <br />documents to certify that the site is available: <br />a. Appropriate documentation which assures that the site may be offered for a period <br />of at least 2 years. This could be: <br />Written certification from the owner <br />eement authorizing an agent to offer the <br />An appropriate real estate listing agr <br />property for sale <br />An option to purchase <br />I6 NC Department of Commerce -- Certified Sites Program <br />