Browse
Search
Agenda - 05-18-2010 - 8b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 05-18-2010 - Regular Mtg.
>
Agenda - 05-18-2010 - 8b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 9:08:50 AM
Creation date
5/14/2010 4:02:24 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8b
Document Relationships
Minutes 05-18-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
must provide a park development plan - This plan should provide a cost <br />g. The applicant <br />estimate for the proposed park development of theupark development plan the applicant <br />must <br />extension <br />lso attach addition <br />the following Idocgumentts: <br />a) A topographic survey or topographic analysis <br />b) An Engineer's site development cost estimate <br />g. The Park must be zoned appropriately (if applicable) - If not, describe land uses <br />surrounding the Park and indicate whether or not rezoning will be required - If yes, <br />attach a letter from the appropriate governing body indicating a commitment to re -zone <br />the Park <br />10. designat d as aneexxemp outside of a <br />site and evidence of sites exemption status must be <br />provided <br />11. The Park must be located outside of the 100 -year flood way Please attach a map <br />depicting the location <br />Flood elevations for lfloodable areas bwithin the park and any filled <br />the of <br />the Park, 100 y <br />engineer's there is certification lgthat the filled areas <br />are in co pl an9e with local ordinances or <br />other recognized standards <br />If the site is located in one of the 20 coastal counties covered by LAMA and not in an <br />12. <br />AEC, the following are required for certification: <br />o At the Intent to Certify stage, a community must provide a letter from the <br />wDivision te Coastal Management <br />CAMA land use plan validates I allowas forindustr ai consistent <br />with th <br />development. approval, the community must <br />o As part of the documentation required for final <br />include the certified CAMA land use plan as part of the site's documentation. <br />, every 2 years, the community provide revised letter <br />recertification 0 For hounty'scrtifed <br />from DCM that that the site is <br />CAMA land use plan and allows for industrial development. <br />Sites that are located in an Area of Environmental Concern (AEC) are not eligible for <br />certification as part of the North Carolina Certified Sites Program. <br />To request a letter 0 2808,88 ',472 62 contact 3 hn.Thayer @n denrgov. You may also contact <br />Access, at di planners listed below: <br />one of the district p Currituck, Dare, Gates, Pasquotank and Perquimans Counties: <br />o Camden, Chowan, <br />Charlan Owens, AICP, District Planner, 252.264.3901, <br />charlan.owens @ncdenr.gov <br />0 Carteret, Craven, e slow (north of the New River) Washington <br />nd Pamlico' Counties: <br />Maureen Meehan Will, 252.808.2808, maureen.will @ncdenr.gov <br />Certified Sites Progra <br />14� l NC Department of Commerce — m <br />
The URL can be used to link to this page
Your browser does not support the video tag.