Browse
Search
Agenda - 05-18-2010 - 8b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 05-18-2010 - Regular Mtg.
>
Agenda - 05-18-2010 - 8b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 9:08:50 AM
Creation date
5/14/2010 4:02:24 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8b
Document Relationships
Minutes 05-18-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Industrial Business Park Certification Criteria <br />1. Submit the Intent to Certify form :pia the website - This form must be approved by the <br />steering committee before a Park s allowed to move forward with the certification <br />process <br />2. The applicant must have a letter ior orn the county on proposal ford municipal commissioners <br />this Park <br />government expressing support <br />3. prospective industrial investorsr' I'achasite amust be available for ar sale or lease to <br />tive minimum of two years <br />- The applicant must attach the i<, lowing documents to certify that the site is available: <br />a. Appropriate documentation : r rich assures that the site may be offered for a period <br />of at least 2 years - This cord( be: <br />Written certificat o ) from the owner <br />An appropriate ree I estate listing agreement authorizing an agent to offer <br />the property for s de <br />An option to purchase <br />A contingency ceri tract to purchase or lease <br />b. A copy of the present deed for the property <br />c. A boundary survey bearing a licensed land surveyor's signed certification is highly <br />recommended, the minimum standard fe Program a lensed surveyor that involves <br />"inspection" survey. This is a survey performed <br />all the steps of a certified boundary survey, including research on all available <br />ortion of <br />recorded data about a site, but does not include the onsite, ground survey p <br />the certified boundary survey. <br />d. The results of a title search showing clear title to the proposed site (the title search <br />must encompass at least the prior 50 year history) <br />e. A county tax map depict ing the location and property boundaries of the site <br />4. The sites in the proposed Industrial Park must have an establi left price and <br />the rims for <br />the sale or lease of the prc f,erty The applicant must <br />controlling entity stating a price and conditions of sale or lease <br />12 1 NC Department of ( ommerce — Certified Sites Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.