Browse
Search
Agenda - 05-18-2010 - 8b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 05-18-2010 - Regular Mtg.
>
Agenda - 05-18-2010 - 8b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 9:08:50 AM
Creation date
5/14/2010 4:02:24 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8b
Document Relationships
Minutes 05-18-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recertification <br />Sites /parks that are certified must be recertified every two (2) years. In order to recertify <br />the site / park, the sponsor must submit the following updated information: <br />Appropriate documentation which assures that the site may be offered or an option <br />two (2) year period such as: an u additional <br />pdated letter from property <br />agreement, updated listing agreement, etc. ating p rice and conditions for sale <br />A current letter from owner or controlling entity indic <br />or lease has changed, <br />A current boundary survey or compiled / inspection survey if the property <br />an easement has been granted or a piece has been sold support for <br />Updated letters from county and /or municipal elected officials expressing <br />certification <br />Updated information regarding essential services to the site <br />New LAMA letter, if applicable <br />A new Master Development Plan if a community combined parcels in the park for a client <br />they would just need to submit reflecting the change. years <br />Sites that a� certification, n, must also resubmit essubmi the following environmental dueedi�gence <br />from the origin <br />.requirements in addition to the requirements listed above: <br />• Phase I Environmental Site Assessment <br />• Preliminary Wetlands Assessment <br />• A new geotechnical study will also be required if there has been any site disturbance <br />such as clearing, grading, <br />Program Criteria <br />The Certified Sites Program criteria were revised in 2008 with input from McCallum <br />Sweeney Consulting and a stakeholder group of state, regional and local economic developers, <br />along with economic development allies from utilities and engineering firms. <br />The Certified Sites Program allows communities to submit sites in one of two categories: <br />Industrial Sites which will be defined as single contiguous, buildable parcels • • Industrial / Business Parks which are sites that are intended (due to topography or other <br />natural features or the desire of the site sponsor) to be sub - divided. <br />C Department of Commerce — Certified Sites Nrogram <br />
The URL can be used to link to this page
Your browser does not support the video tag.