City of Greensboro, Greensboro Transfer Station, Greensboro, NC. HDR was
<br />selected for the Design & Permitting of the Transfer Station, and development of an RFP
<br />to solicit proposals for hauling and disposing of the City's Municipal Solid Waste (MSW).
<br />City of Winston - Salem, Hanes Landfill Expansion Cell I Design, Winston - Salem, NC.
<br />Engineer Staff. Task includes all necessary permits and construction documents for
<br />construction of the first cell of the landfill expansion.
<br />City of Winston- Salem, Hanes LF - Construction Admin/CQA, Winston - Salem, NC.
<br />Work includes Construction Administration, Construction Quality Assurance for the
<br />landfill and the leachate management facility for the Hanes Landfill Expansion.
<br />City of Winston - Salem, Old Salisbury Rd Phase IV Construction, Winston- Salem,
<br />NC. HDR was retained to perform a Phase IV Construction at Old Salisbury Road.
<br />Existing Subtitle D Landfill, Coastal Regional Solid Waste Management Authority,
<br />Craven County, NC. Provided construction monitoring services and general site
<br />supervision during remediation activities. Acting/ temporary landfill operations manager
<br />for the duration of the project.
<br />Greensboro Phase IH Cells 1 and 2 Expansions, Greensboro, NC. 39.5 -acre Subtitle D
<br />Expansion. Resident project representative during the construction phase. Duties include
<br />construction monitoring, contract administration, coordination of subcontracted CQA field
<br />and laboratory services, and preparation of the certification report.
<br />Hanes Landfill 40 -Acre Closure, Winston - Salem, NC. Resident project representative
<br />during closure system construction. Responsible for acceptance of the multiple layer
<br />Dean E. Ferry, CET
<br />Registration
<br />Senior Construction Coordinator
<br />Cerffied Engineering
<br />Technician: NICET Certification
<br />No.083457
<br />Professional Experience
<br />SWANA Certified Landfill
<br />Mr. Ferry, a senior construction coordinator, has more than 27 years of experience in
<br />Technical Associate, I.D. No.
<br />construction quality assurance, resident engineering, and laboratory testing. He has an
<br />48071
<br />extensive background in the day -to -day operation and construction of solid waste landfills.
<br />Mr. Ferry has been responsible for the coordination of CQA personnel, geotechnical and
<br />Professional Affiliations
<br />geosynthetics laboratory testing, the review of all field documentation, the preparation of
<br />American Society of Certified
<br />Engineering Technicians,
<br />certification reports, and constructability reviews of design projects. Additionally, Mr.
<br />Member
<br />Ferry has conducted periodic in -house training seminars primarily dealing with the
<br />National Institute for Certification
<br />monitoring of geotechnical and geosynthetics construction projects. He also has acted as
<br />in Engineering Technologies,
<br />liaison between regulators, owners, and engineers, and has completed extensive laboratory
<br />Member
<br />and field- testing.
<br />Solid Waste Association of North
<br />America (SWANA), Member
<br />HDR Project Experience
<br />City of Durham, Phase I, Durham, NC. The project consists of services to the City of
<br />HDR Tenure
<br />13 Years
<br />Durham, North Carolina. Phase I includes construction administration of a public service
<br />facility consisting of a recycling drop -off facility, small vehicle unloading area, swap
<br />Industry Tenure
<br />shop, drop -offs.
<br />31 Years
<br />City of Greensboro, Gboro Cells 1, 2,3 - Construction Monitoring, Greensboro, NC.
<br />Resident Project Rep 1. HDR was retained for design and construction monitoring for Cell
<br />3 at White Street.
<br />City of Greensboro, Greensboro Transfer Station, Greensboro, NC. HDR was
<br />selected for the Design & Permitting of the Transfer Station, and development of an RFP
<br />to solicit proposals for hauling and disposing of the City's Municipal Solid Waste (MSW).
<br />City of Winston - Salem, Hanes Landfill Expansion Cell I Design, Winston - Salem, NC.
<br />Engineer Staff. Task includes all necessary permits and construction documents for
<br />construction of the first cell of the landfill expansion.
<br />City of Winston- Salem, Hanes LF - Construction Admin/CQA, Winston - Salem, NC.
<br />Work includes Construction Administration, Construction Quality Assurance for the
<br />landfill and the leachate management facility for the Hanes Landfill Expansion.
<br />City of Winston - Salem, Old Salisbury Rd Phase IV Construction, Winston- Salem,
<br />NC. HDR was retained to perform a Phase IV Construction at Old Salisbury Road.
<br />Existing Subtitle D Landfill, Coastal Regional Solid Waste Management Authority,
<br />Craven County, NC. Provided construction monitoring services and general site
<br />supervision during remediation activities. Acting/ temporary landfill operations manager
<br />for the duration of the project.
<br />Greensboro Phase IH Cells 1 and 2 Expansions, Greensboro, NC. 39.5 -acre Subtitle D
<br />Expansion. Resident project representative during the construction phase. Duties include
<br />construction monitoring, contract administration, coordination of subcontracted CQA field
<br />and laboratory services, and preparation of the certification report.
<br />Hanes Landfill 40 -Acre Closure, Winston - Salem, NC. Resident project representative
<br />during closure system construction. Responsible for acceptance of the multiple layer
<br />
|