Orange County NC Website
75 <br />letter of interest for a community to host a facility. <br />City of Durham, Phase I, Constr. Admin. Services, Public Service Facilities, Durham, <br />NC. Engineer Staff. The project consists of services to the City of Durham, North Carolina. <br />Phase I includes construction administration of a public service facility consisting of a <br />recycling drop -off facility, small vehicle unloading area, swap shop, drop -offs. <br />City of Greensboro, Cost Evaluation for Phase III, Bioreactor Evaluation, NC. Project <br />Engineer. This contract covers a cost evaluation for Phase III, Bioreactor evaluation, <br />partnering meetings and process and general services provided on an as needed basis. <br />City of Winston - Salem, Hanes Landfill Expansion Cell 1 Design, NC. Engineer Staff. <br />Task includes all necessary permits and construction docmnents for construction of the first <br />cell of the landfill expansion. <br />City of Winston - Salem, Hanes LF - Const Mmritoring /CQA for Cell 3A, NC. HDR was <br />selected for construction monitoring and construction quality control (CQA) for Cell 3A of <br />the Hanes Landfill in Winston - Salem. <br />City of Winston - Salem, Hanes LF - Construction Admin/CQA, NC. Engineer Staff. <br />Work includes Construction Administration, Construction Quality Assurance for the landfill <br />and the leachate management facility for the Hanes Landfill Expansion. <br />Greenville County, New Landfill Siting, Greenville, SC. Engineer Staff. This contract <br />involves the provision of consulting engineering and design services in the siting and design <br />of a new subtitled D Landfill for Greenville County, SC. <br />Guilford County, Design, Permitting, Constr. Admin, Greensboro, NC. Project <br />Manager. Managed the preparation of the site layout, permit application, design, construction <br />contract documents, and construction observation of a scrap tire and white goods collection <br />facility. <br />Durham Transfer Station, Analysis, Durham, NC, MBI,. Project Manager. Structural <br />analysis and repair of damaged transfer station. <br />Moore County, Groundwater Wells and Monitoring, Moore Co., NC. HDR will <br />coordinate the installation of two new monitor wells to replace MW -12 and MW -12D. This <br />includes the preparation and submittal of a work plan for NCDENR's approval. Methane <br />monitoring on a quarterly basis. <br />Olver Incorporated, Wake County, South Wake Landfill, NC. Project Manager. This <br />work includes performing assistance with permitting, planning, and coordination for the start <br />of the South Wake Landfill. Additional work includes coordination efforts include <br />communications with contractors (Waste Industries), soil resource investigations, contractor <br />oversight, test reviews, and permit compliance. <br />Roanoke Valley Resource Authority, Engineering Services, Roanoke, VA. Project <br />Manager. HDR will provide consulting engineering services to review and report on RVRA <br />staff prepared adequacy report for the Replacement Reserves, Closure, and Post - Closure <br />Requirements under the Master Indenture of Trust for the RVRA's Outstanding Revenue <br />Bonds. <br />Southeastern Public Service Authority, 43 -Acre Cell V Expansion, Suffolk, VA. Project <br />Manager General. This work includes providing construction administration and <br />construction quality assurance services during construction of the Cell V Expansion of the <br />SPSA Regional Landfill. <br />Southeastern Public Service Authority, SPSA Transfer Station, Portsmouth, VA. <br />Engineer Staff. HDR prepared a preliminary design report for the proposed SPSA Transfer <br />Station to be located at the regional landfill. <br />Douglas T. DeCesare - Page 2 A 1 l <br />